© STULZ GmbH, Hamburg
EN / 10-2015 / 1000683
-
75
-
STULZUltraSonic-SystemforDirectRoomHumidificationBNB-
Maintenance
11.3. Visual inspection
1
Switch off power supply and secure so it
cannot be switched back on.
4
Remove mist guide tubes and inspect
transducers.
5
Assemble the unit in reverse order.
3
Remove cover and check inside the unit.
2
Check system from the outside.
Proceedasfollowstoperformthevisualinspection:
CAUTION
Time intervals of maintenance cycles.
If mineral salt residues or other major impurities are discovered, check the water treatment system and
itsmonitoringdevices(conductivitymeasuringequipment/humiditysensors)andventilationsystem
(e.g.filters).
NOTICE