Studer Xcom-MS Скачать руководство пользователя страница 20

Studer Innotec SA
Xcom-MS

20

V1.0.1

User Manual

7.  Troubleshooting

To ensure a smooth running of the system it is important to set it up in accordance with the installation manuals
from Studer Innotec SA and MorningStar. If at commissioning the system is not operational, please check
your installation's compliance with the requirements stated in the manuals mentionned above.

If your system still isn't working, please check the following points:

1. Check  the  position  of  the  programmation  switches  on  the  MPPT  TriStar  solar  charge  controllers.  The

switches 4, 5 and 6 should be set to "ON".

2. Check  that  the  software  update  of  the  Xtender  system  was  carried  out  in  accordance  with  the  official

procedure. The latest software version of your installation is available on the SD card delivered with the
Xcom-MS or can be downloaded from our website: http://www.studer-innotec.com.

3. Check the wiring and that the communication cable RS-485 is correctly inserted in the connection com-

partment.

4. Check that the address assignement procedure described in section 4.4 has been followed.

5. Check that the battery voltage is visible on the TriStar solar charge controller terminals.

6. The TriStar solar charge controller can function without connection to the Xcom-MS. When the RS-485

connector is disconnected, the TriStar solar charge controller will stop automatically. It has to be discon-
nected from the battery and then reconnected in order to function in autonomous mode. On the contrary,
only one solar charge controller without battery connection will put the RS-485 bus out of order.

7. If the Xtender installation is disconnected (for example by disconnecting the communication cable) or shut

off, the TriStar solar charge controller will automatically return to an independant mode and will continue
to charge and maintain the battery.

8. When  the  synchronisation  is  activated  {8001},  the  TriStar's  green  LED  is  normally  flashing  once  every

second (as when it is in independent absorption mode). With the synchronisation activated, it is also pos-
sible to indicate the charge phase in one of the two battery information fields on the RCC-02/-03 remote
control's Xtender screen.

Содержание Xcom-MS

Страница 1: ...Communication bridge Xcom MS User Manual Copyright 2011 Studer Innotec SA V1 0 1...

Страница 2: ......

Страница 3: ...m support Legal Notice The use of Studer Innotec SA devices is the responsibility of the customer in all cases Studer Innotec SA reserves the right to make any modification to the product without prio...

Страница 4: ......

Страница 5: ...er levels and accessibility 18 6 3 BASIC SETTINGS 8000 18 6 3 1 Address of the MPPT selected to be on the display 8014 18 6 3 2 Charge cycles synchronization activated 8001 18 6 3 3 Change the RS 485...

Страница 6: ...vi V1 0 1 User Manual...

Страница 7: ...in full respect of fixed procedures Each Xcom MS has a specific serial number allowing for a perfect follow up of the controls in conformity with the specific data of every device For this reason it...

Страница 8: ...nd a hardware upgrade may be required Please contact your reseller for any additional information on compatibility 1 4 Safety precautions Generalities Do read carefully all safety instructions before...

Страница 9: ...rectives and norms Low voltage directive 2006 95 EC EN 60950 2005 EMC directive 2004 108 EC EN61000 6 1 2005 and EN61000 6 3 2006 RoHS directive 2002 95 EC CH 1950 Sion November 2011 Studer Innotec SA...

Страница 10: ...Studer Innotec SA Xcom MS 10 V1 0 1 User Manual 3 Dimensions 3 1 Views of different sides with dimensions Figure 3 1 Views of different sides with dimensions...

Страница 11: ...Studer Innotec SA Xcom MS User Manual V1 0 1 11 3 2 Exploded view Figure 3 2 Exploded view...

Страница 12: ...on schematics of the Xcom MS The installation includes three steps Start by connecting the Xcom MS with the Xtender communication bus according to the procedure explained in section 4 3 Secondly assig...

Страница 13: ...for termination of the Xtender communication bus This switch turns on or off the termination of the communi cation bus See section 4 3 The termination is by default activated 4 3 Connecting the Xtende...

Страница 14: ...Xtender communication bus which automatically assignes the addresses these will have to be manually configured for all devices on the RS 485 bus Begin by connecting the Xcom MS with the Xtender bus a...

Страница 15: ...to the RS 485 Confirm the new value by pressing SET Wait five seconds for the new address to be taken into account If there is a problem with the new setting the screen of the RCC 02 03 flashes red Di...

Страница 16: ...ery voltage Ubat Vdc Battery voltage This is an average of all the solar charge controllers values as they may have small measuring differences Sum of battery currents Ibat A Current injected into the...

Страница 17: ...ge controllers use their own battery cycle which is synchronised with the parameter set in the Xcom MS This is the default behaviour The internal set of paramenters in the solar charge controllers is...

Страница 18: ...are driven by the Xcom MS to follow the same charge cycle as the inverter charger s see section 5 2 When activating this parameter 8001 it is essential to check that the Xtender para meter 1158 End of...

Страница 19: ...cycle 6 4 4 Battery absorption voltage 8009 Voltage value for the absorption cycle 6 4 5 Absorption time 8010 Duration of the absorption phase 6 4 6 Battery temperature compensation 8011 A factor use...

Страница 20: ...ent 4 Check that the address assignement procedure described in section 4 4 has been followed 5 Check that the battery voltage is visible on the TriStar solar charge controller terminals 6 The TriStar...

Страница 21: ...c 8004 Battery floating level Vdc 13 6 9 5 18 27 2 19 36 54 5 37 9 72 Basic 8005 Maximum delay in floating hours 2 2 18 2 2 18 2 2 18 Basic 8006 Battery voltage level to start a new cycle Vdc 12 5 9 5...

Страница 22: ......

Страница 23: ......

Страница 24: ...Studer Innotec SA Rue des Casernes 57 1950 Sion Switzerland 41 0 27 205 60 80 41 0 27 205 60 88 info studer innotec com http www studer innotec com...

Отзывы: