Stübbe C 10 Series Скачать руководство пользователя страница 3

About this document

1

About this document

This manual

is part of the fitting

applies to all series referred to

describes safe and proper operation during all operating
phases

1.1

Target groups

Operating company

Responsibilities:

Keep this manual available at the place of operation,
also for future use.

Ensure that employees read and observe this manual
and other applicable documents, especially the safety
instructions and warnings.

Observe any additional country-specific rules and reg-
ulations that relate to the system.

Qualified personnel, fitter

Mechanics qualification:

Qualified employees with additional training for fitting
the respective pipework

Electrical qualification:

Qualified electrician

Responsibility:

Read, observe and follow this manual and the other
applicable documents, especially all safety instructions
and warnings.

1.2

Other applicable documents

Resistance lists

Resistance of materials used to chemicals

www.stuebbe.com/pdf/300051.pdf

Data sheet

Technical data and conditions of operation

www.stuebbe.com/pdf/302457.pdf

CE declaration of conformity

Conformity with standards

www.stuebbe.com/pdf/300168.pdf

Electric drive operating manual
Limit switch box operating manual

Tab. 1

Other application documents, purpose
and where found

1.3

Warnings and symbols

Symbol

Meaning

Immediate acute risk

Death, serious bodily harm

Potentially acute risk

Death, serious bodily harm

Potentially hazardous situation

Minor injury

Potentially hazardous situation

Material damage

Safety warning sign

Take note of all information
highlighted by the safety warning
sign and follow the instructions to
avoid injury or death.

Instruction

1., 2., ...

Multiple-step instructions

Precondition

Cross reference
Information, notes

Tab. 2

Warnings and symbols

302 451

BA-2022.08.16 EN

C 10

3

Содержание C 10 Series

Страница 1: ...int No 302 451 TR MA DE Rev001 ST BBE GmbH Co KG Hollwieser Stra e 5 32602 Vlotho Germany Phone 49 0 5733 799 0 Fax 49 0 5733 799 5000 E mail contact stuebbe com Internet www stuebbe com Subject to te...

Страница 2: ...5 5 1 Electrical connection 8 5 5 2 Pneumatic connection 8 5 5 3 Check sense of rotation of drive 9 5 6 Performing the hydrostatic test 9 6 Operation 9 6 1 Commissioning 9 6 2 Emergency manual operat...

Страница 3: ...especially all safety instructions and warnings 1 2 Other applicable documents Resistance lists Resistance of materials used to chemicals www stuebbe com pdf 300051 pdf Data sheet Technical data and...

Страница 4: ...of competence and the supervision of personnel The following work should be carried out by specialist tech nicians only Installation repair and maintenance work Work on the electrical system Make sure...

Страница 5: ...ding fusion socket end Fusion spigot end 3 3 Assembly 3 3 1 C10 manual 1 2 3 4 Fig 2 C10 manual 1 T handle 2 Union nut 3 Insert here socket 4 Housing with ball 3 3 2 C10 electric drive 2 3 4 5 6 1 Fig...

Страница 6: ...ample Lift the fitting with properly installed lifting gear and position it at the place of installation 4 3 Storage NOTE Material damage due to inappropriate storage Store the fitting properly 1 Make...

Страница 7: ...alling fitting in pipe WARNING Risk of poisoning and environmental damage from medium Leak due to faulty installation Installation work on the pipes should only be performed by technicians who have be...

Страница 8: ...drive Electric drive operating manual 3 Connect limit switch in limit switch box limit switch box operating manual 5 5 2 Pneumatic connection Solenoid pilot valves are available for control of the pn...

Страница 9: ...ective equipment when carrying out any work on the fitting 1 Opening and closing the fitting Hand lever Position indicator along the pipe Fitting opened Hand lever Position indicator perpendicular to...

Страница 10: ...ith springs e g pneumatic drive carefully since spring tension can cause components to be ejected 7 2 1 Removing fitting 1 Ensure that System is empty System has been flushed System is depressurized S...

Страница 11: ...onnection mixed up at pneumatic drive Check compressed air connection and correct if necessary supplementary instructions for drives Control function is not right Electrical connection faulty Check el...

Страница 12: ...g max 16 bar 20 15 10 10 10 25 20 12 12 12 32 25 15 12 12 40 32 20 15 15 50 40 25 15 15 63 50 30 20 20 Tab 5 Tightening torques 1 Use a torque wrench 9 3 Operating torques The specified values are sta...

Страница 13: ...ce Designation 1 1 Housing with ball 2 1 T handle 3 1 Circlip 4 1 pressure piece 5 1 Radial rotary shaft seal 6 2 Insert 7 2 Union nut 8 2 Radial rotary shaft seal 9 1 Bracket 10 1 Coupling 11 1 Mount...

Отзывы: