Chapter Four – Maintenance Procedures – Base
77
4.5 LIFT MOTOR AND CAPACITOR REMOVAL AND REPLACEMENT
(LIFT MOTOR KIT P/N 3000–200–727, LIFT CAPACITOR KIT P/N 3000–200–745)
Required Tools:
3/16” Hex Allen Socket
5/16” Socket Wrench
Phillips Screwdriver
7/16” Open End Wrench
Side Cutters
Bungee Cord (or equivalent)
A
B
D
FOOT END
C
Procedure: (This procedure will take approximately 1 hour)
1. Unplug the power cord from the wall socket. Remove lower lift cover (see page 67).
2. Remove upper lift cover (see page 67).
3. Using a 5/16” nut driver, remove the two screws holding the front and back metal access panels to the lift
housing assembly and remove the panels (reference drawing on page 88).
4. Disconnect the two connectors (A) at the motor capacitor.
5. Disconnect the white connector (B) from the power cord.
6. Using side cutters, cut the cable ties holding the capacitor (C) to the base and remove the capacitor.
7. Using a 3/16” hex allen socket, remove the four screws (D) holding the motor assembly in the lift housing
and remove the motor assembly.
8. Use the access holes in the lift housing to view the alignment of the new motor drive shaft to the motor
coupler. Lift the motor into place and secure it with the bolts removed in step 7. Hold the nuts that the
bolts are being turned into through the access holes until the threads of the bolts are started.
9. Using cable ties, reinstall the new capacitor to the base.
NOTE
The drive shaft on the new motor probably will have to be turned to be aligned with the coupler. Use a 7/16”
open end wrench to turn the drive shaft of the motor.
10. Reattach the three connectors, return all wiring to its original position and reinstall all panels and covers.
NOTE
The procedure for lift motor and capacitor removal and replacement is the same for both ends of the bed.
Содержание Secure 3000
Страница 78: ...Notes 78 ...
Страница 106: ...Notes 106 ...
Страница 110: ...Chapter Five Maintenance Procedures Litter 110 5 6 CPR CONTINUED A B C K J B Area 1 B D L A G H ...
Страница 111: ...Chapter Five Maintenance Procedures Litter 111 5 6 CPR CONTINUED E E F F VIEW 1 VIEW 2 TOP VIEW ...
Страница 129: ...Appendix A Assembly Drawings and Parts Lists 129 A 1 BASE DRAWINGS BASE ASSEMBLY P N 3000 200 000 ...
Страница 131: ...Appendix A Assembly Drawings and Parts Lists 131 A 1 BASE DRAWINGS CONTINUED BASE ASSEMBLY P N 3000 200 000 CONTINUED ...
Страница 139: ...Appendix A Assembly Drawings and Parts Lists 139 A 1 BASE DRAWINGS CONTINUED FOOT END BRAKE ASSEMBLY P N 3000 200 350 ...
Страница 141: ...Appendix A Assembly Drawings and Parts Lists 141 A 2 LITTER DRAWINGS LITTER ASSEMBLY MECHANICAL P N 3000 300 399 ...
Страница 147: ...Appendix A Assembly Drawings and Parts Lists 147 A 2 LITTER DRAWINGS CONTINUED LITTER COVER ASSEMBLY P N 3000 300 25 ...
Страница 184: ...Notes 167 2 ...
Страница 241: ...Appendix B Circuit Board Locations Bed Wiring Diagrams 222 This page intentionally left blank ...
Страница 243: ...Appendix B Circuit Board Locations Bed Wiring Diagrams 224 This page intentionally left blank ...
Страница 249: ...DH 3 94 3000 000 020 REV B 420 Alcott Street Kalamazoo MI 49001 ...