Page 8 of 13
Step 5)
Attach two Support Tubes (#22) to each Outer Vertical Post Assembly (#23). Insert the
Bolt (#5) through the top of the Support Tube, and through the Eyelet. Slip on a Washer
(#6) and Spring Washer (#7) and secure with the Nut (#8). Attach the other end of the
Support Tube to the Base Assembly with Bolts, Washers, Spring Washers, and Nuts.
Repeat for all four Support Tubes.
Step 6)
Insert the Inner Vertical Post (#21) into the Outer Vertical Post (#23). Insert one (1) Pin of
the Pins with Chain (part #18) through the slot and the Inner Vertical Post Hole so that it
goes all the way through to the other pin. Attach the Handle (#24) to the bracket on the
side of Outer Vertical Post, insert the Bolt (#10) from the inside, slip on the Washer (#14)
and Spring Washer (#15) and secure with the Nut (#11). Make sure the two (2) hooks of
the Handle hold the two ends of the Pin (#18). Repeat for the other Post Assembly.
Step 7)
Tighten all the Bolts and Nuts securely and make certain that the entire assembly is tight
and secure.
Step 8)
Test the crane according to manual and ANSI/ASME B30.17 standards.
Operating Instructions
⚠
WARNING
Never force the crane or attachment to do the work of a larger industrial tool. It is designed to do the
job correctly and safely in the manner for which it was intended.
Step 1) Move the crane so that it is directly above the item to be lifted.
Step 2) Securely fasten the item to the crane with the appropriate trolley or hoist.
Содержание 52523
Страница 10: ...Page 10 of 13 Parts Diagram ...