
14
MA_VEB100-3_A2_181015_en
3.2
3.2.1
Needle lever
Assembly
C A U T I O N !
Switch off the machine electrically!
, move the Thread take-up lever and remove the
needle lever. During installation, please ensure that the needle runs through the
centre of the needle groove and the needle tip is flush with the left needle guide
.
Fig. 5
Содержание VEB100-3
Страница 4: ......
Страница 8: ...4 MA_VEB100 3_A2_181015_en...
Страница 15: ...11 MA_VEB100 3_A2_181015_en Fig 1...
Страница 20: ...16 MA_VEB100 3_A2_181015_en Fig 7...
Страница 42: ......