
VISIT US ON THE WEB TO CHECK OUT MORE GREAT PRODUCTS — www.strechplastics.com
STRECH PLASTICS ARE MANUFACTURERS AND DISTRIBUTORS OF THE HIGHEST QUALITY GOLF CAR PRODUCTS
27
ASSEMBLY
STEP 18:
Install spindle and spindle
spacer. Make sure that the
steering control arm points
forward on both left and
right side.
STEP 19:
Align upper J arm heim
with lower A arm king pin
and apply LOCTITE
®
on
J arm heim threads and
screw them together, be
sure to use the 1/2”-20 SAE
grade 8 washers. This step
will require some dexterity
and some muscle to make
them align. You will prob-
ably want to use a pry bar
to get it into position.
NOTE: APPLYING
LOCTITE
®
ON HEIM
THREADS IS A VERY
IMPORTANT STEP —
IF NOT DONE MAY
CAUSE SERIOUS
DAMAGE OR INJURY.
STEP 20:
Install coil over progres-
sive shocks. The shock
attaches to lower A arm
and sub frame. Make sure
to use four washers and
two shock sleeves for each
shock. Use a 3/8” x 2”-16
grade 8 bolt and a 3/8”-
16 Nylock nut on each
shock eye mount.