![Strebel Super HR Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/strebel/super-hr/super-hr_operating-instructions-manual_1384122005.webp)
Operating instructions S-HR serial page
2
The unit anticipates the heat required by the heating installation and/or hot water facility.
By doing so a low as possible heat input is given for the required output.
The apparatus is provided with an electrical ignition and energy saving pump start to prevent waste of energy. Furthermore the revolutions
per minute of this circulation pump will adjust itself to the amount required by the installation.
As a result unnecessary system noise is prevented.
When the apparatus has been out of operation for a longer period of time the circulation pump will periodically start to prevent sticking when
an outside sensor has been connected to the unit. The circulation pump will start automatically when there is a chance of frost to prevent
danger of freezing.
The efficiency of the apparatus is very high and the radiation convection and standby losses very low. The emission of noxious substances
is far below the fixed standards so the apparatus meets the requirements of the Gaskeur HR (High Efficiency) and Gaskeur SV (Clean
Combustion).
If the apparatus is designed in combination with the Brain thermostat, information about the working of the apparatus can be displayed at
the Brain thermostat. It is also possible to turn on and select from this thermostat the different programs. For more information on the Brain
thermostat you are referred to the user instructions of the Brain thermostat.
3
Содержание Super HR
Страница 1: ...OPERATING INSTRUCTIONS 8G 52 20 01 09 02 We reserve the right to make changes Reliability Innovations ...
Страница 2: ......
Страница 13: ...Operating instructions S HR serial page 2 7 ...
Страница 14: ......