background image

BATHTUB INSTALLATION

1. 

Ensure that the floor at the installation site has sufficient floor support and is level.

2. 

Waterproofing the floor is highly recommended.

3. 

Determine the location of the drainpipe on the floor by taking measurements of the drain and waste 

 

location underneath the unit. Clean the drain hole area in preparation of setting the drain. The area 

 

should be dry & free from any debris.

4. 

Remove the bathtub from its box. It is recommended that the bathtub is carried by a minimum of 

 

two people. Ensure to carry and set down the bathtub only in the upside-down position.

Содержание K-2089-71FSWHSS-DM

Страница 1: ... 310 935 0028 support streamlinebath com READ ENTIRE INSTALLATION GUIDE PRIOR TO INSTALLING THE BATHTUB THIS BATHTUB SHOULD ONLY BE INSTALLED BY A CERTIFIED PLUMBER CAUTION TWO PEOPLE ARE REQUIRED TO LIFT THE BATHTUB FREESTANDING BATHTUB SERIES OWNER S MANUAL INSTALLATION GUIDE ...

Страница 2: ...odes may vary state to state Streamline shall not be held liable for any and all incidental damages or flood caused due to use of this product Streamline shall not be held liable for any and all fees stemming from cost of installation re installation removal subsequent damage or transportation in a case of a product defect Silicone Bathtub Flexible Hose pre installed Adjustable Key Measuring Tape ...

Страница 3: ...DIAGRAM Cover DESCRIPTION Qty No Gasket Gasket Gasket Core Cap Body 1 2 3 4 5 6 7 1 1 1 1 1 1 1 Flexible Hose Drain Diameter 1 5 Pre Installed to Bathtub Overall Tube Length 36 1 2 3 4 5 6 7 ...

Страница 4: ... the drainpipe on the floor by taking measurements of the drain and waste location underneath the unit Clean the drain hole area in preparation of setting the drain The area should be dry free from any debris 4 Remove the bathtub from its box It is recommended that the bathtub is carried by a minimum of two people Ensure to carry and set down the bathtub only in the upside down position ...

Страница 5: ...he panel frame 6 Drill faucet holes and assemble the faucet according to according to the manufacturer s instructions 7 Move the panel frame to desired installation location 8 Proceed to place the provided flexible drain hose into the floor drain ...

Страница 6: ... the panel 12 If you are placing your bathtub against the wall apply silicone sealant along the edges 9 Please note the flexible hose is a basic way that we provide to connect to the end plumbing in a home The plumbing installation in every home differs so please consult with a certified plumber to see if the plumbing in your home is compatible with using a basic flexible hose ...

Отзывы: