
Step 5.
Install the Upper Main Frame back to the
body.
(Apply little amount of Thread Locker
when installing Screws to metal part.)
Step 6.
Insert the FPV & GPS Mounting Assembly
completely to touch the Upper Main Frame
and secure it by tighten the M3 Screw circled
above.
Step 7.
Prepare the Landing Gear Frame Assembly.
Step 8.
Install the Landing Gear Frame Assembly to
the Lower Main Frame of the body using four
M3x10 Hex Cap Screws.
(Apply little amount
of Thread Locker when installing Screws to
metal part.)
13