AC Power and HVAC Service Requirements
2-4
Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide
(R786)
To determine HVAC requirements
1. Add together the values from the bottom lines of Tables
, and
, subtract
the storage enclosure total from
, and enter the value in the
Total Watts
2. Multiply the value in the
Total Watts
column by 3.41, and enter the number of BTUs
in the
BTUs/hr. Subtotal
column.
AC Power Outlet Requirements
If you
do
use a pair of PDUs in the cabinet, use Tables
and
to determine the
total number of power outlets required
outside the cabinet
.
1. In the
Quantity
column, write the number of each type of component.
2. Multiply the value in the
Quantity
column by the value in the
Outlets
column, and
enter the total in the
Subtotal
column.
3. Add the values in the
Subtotal
column and enter the sum on the bottom line.
Table 2-4. HVAC Requirements
Total Watts
(From Tables
,
Convert to BTUs
BTUs/hr. Subtotal
x 3.41 =
Table 2-5. Worksheet: A-Side External Power Outlet Requirements: PDUs Used
Component
Quantity
Outlets
Subtotal
PDUs
x
1
Other external components
TOTAL NUMBER OF A-SIDE POWER OUTLETS
Table 2-6. Worksheet: B-Side External Power Outlet Requirements: PDUs Used
Component
Quantity
Outlets
Subtotal
PDUs
x
1
Other external components
TOTAL NUMBER OF B-SIDE POWER OUTLETS
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...