Site Planning for ftServer 2600, 4500, and 6300 Systems
1-1
Chapter 1
Site Planning for ftServer 2600, 4500,
and 6300 Systems
1-
For an overview of required information and tasks you need to perform to prepare a site
for ftServer 2600, 4500, and 6300 systems, see:
“Site Planning Overview” on page 1-1
“Site Planning for Fault-Tolerant Systems” on page 1-3
“Site Planning Checklist” on page 1-3
“System Documentation” on page 1-7
Site Planning Overview
Site planning for fault-tolerant systems
includes:
Purchasing an appropriate cabinet and monitor
If you do not purchase a monitor from Stratus, provide a monitor that meets the
system’s requirements.
N O T E
A monitor, keyboard, and mouse are required to install
ftServer System Software (ftSSS).
If you do not purchase a cabinet from Stratus, provide a cabinet that meets the
system’s requirements.
Provide electrical power sources that meet the requirements of the system and
optional components, optionally including the purchase of a qualified
uninterruptible power supply (UPS)
.
Содержание ftServer 2600
Страница 1: ...Stratus Technologies R638 02 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 44: ...Grounding Requirements 2 16 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 48: ...Planning for Cables 3 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 64: ...Example of PDU Usage Calculation 5 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 70: ...Monitor Requirements 6 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 80: ...AAP87600 PDU Specifications A 10 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 98: ...Index Index 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...