![Stratus ftServer 2510 Скачать руководство пользователя страница 72](http://html1.mh-extra.com/html/stratus/ftserver-2510/ftserver-2510_site-planning-manual_1383762072.webp)
Monitor Requirements
6-4
Stratus ftServer 2510, 4410, and 6210 Systems: Site Planning Guide
(R627)
Monitor Requirements
If you are using a monitor that is not supplied by Stratus, make sure that:
The monitor accepts universal 100–240 volts AC (VAC), 50/60 Hertz (Hz) power.
The VGA cable has a 15-pin D-sub connector.
The power cord for the monitor is long enough to reach the power source.
The plug type on the power cord is compatible with the external power source at
the site.
ftSSS for VMware vSphere does not support the uninterrupted use of a
directly-attached VGA monitor, mouse, and keyboard, except during installation of
VMware ESX and ftSSS. See
for information about
the alternative method for directly connecting to ftServer systems running VMware
ESX.
Management PC Requirements
For ftServer systems running VMware ESX, you must provide a computer to be the
management PC. The computer must have:
A serial port
Terminal emulation software installed.The emulator must be able to transmit
keystrokes such as F1 and F2 to interact with the BIOS.
A serial cable connects the management PC to the ftServer system’s COM2 port to
allow you to directly manage the ftServer system. Use the VMware vSphere Client to
manage the server, but also provide serial access to the system from a management
PC. You can provide this access either from a computer that is located near the
ftServer system and directly attached by the serial cable, or from a computer that is
connected to the ftServer system through a serial port concentrator.
Содержание ftServer 2510
Страница 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 46: ...Grounding Requirements 2 18 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 62: ...Modem Requirements for Brazil 4 12 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 68: ...Sample PDU Usage Calculation 5 6 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 96: ...Electrical Power Connectors B 10 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...