Room Requirements
4-2
Stratus ftServer 2500, 4400, and 6200 Systems: Site Planning Guide
(R609)
Has sufficient floor space for external components.
Provides a table or desktop for external devices such as a telephone, external
monitor, keyboard, and mouse, and for systems running ftSSS for VMware
vSphere, a management PC.
For ftServer systems running ftSSS for VMware vSphere, provide a monitor,
keyboard, and mouse to install VMware ESX and ftSSS for VMware vSphere. For
access to the ftServer system after you install the operating system and ftSSS,
arrange for a serial connection from a management PC to the ftServer system.
Each of these devices requires table or rack space. You
cannot
place a peripheral
component on top of a system cabinet.
Allows the system and peripheral devices to be placed within the room so that
power cords and communications cables will reach their respective power
receptacles, telephone jacks, and other connection points.
Provides communications cable connectors or patch panels as needed.
Provides two electrically separate grounded AC wall outlets, within reach of the
power cords from the system or PDUs, and if used, UPS units. Detachable power
cords are 12 ft. (3.65m). If the power cord must be hard-wired, consult an
electrician to plan the length of the power cord.
N O T E
Systems running ftSSS for the Linux Operating System
and ftSSS for VMware vSphere do not support the use of
a UPS.
Provides grounded AC wall outlets for external components that do not connect to
a PDU.
Provides cutouts in the floor for routing cables, if the site has an elevated floor.
Contains space for future expansion.
C A U T I O N
!
Do not place the system in an area of high electrostatic
discharge. Static electricity may damage components.
Do not locate components near transformers or other
electromagnetic devices.
See
Appendix A, “System Specifications”
and
Stratus ftServer Systems: Peripherals
Site Planning Guide
(R582) for the dimensions of system components.
Содержание ftServer 2500
Страница 1: ...Stratus Technologies R609 04A Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide ...
Страница 5: ...Contents Contents v Index Index 1 ...
Страница 12: ...Preface xii Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 29: ...Safety Notices Site Planning for ftServer 2500 4400 and 6200 Systems 1 17 W A R N I N G ...
Страница 30: ...Safety Notices 1 18 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 56: ...Planning for Cables 4 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 68: ...Modem Requirements for Brazil 5 12 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 74: ...Sample PDU Usage Calculation 6 6 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 98: ...Electrical Power Connectors B 10 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 106: ...Index Index 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...