ATTACHING THE DECKING continued...
Fasten the first sheet using two rivets in each
‘pan' (4 for each sheet on each support). The
deck is riveted from underneath through the
back channel and the front from the top through
the deck, truss and gutter (see Figures 13 and
14). Subsequent sheets are clipped to the
previous sheet and riveted.
On units requiring intermediate beams each
deck must be riveted to these beams in the
same manner as to the front truss - namely 4
rivets per sheet. Waterproof each rivet with a
touch of silicone and remember to remove all
swarf as you go.
FINAL FIXINGS - GUTTERS
Gutter straps (Universal Deck Straps) clip into the inside roll of the gutter, and are riveted through the decking into the truss on the
inward, end. Check the alignment of the gutter against the truss (to ensure it is straight and flush) before final fastening to the truss.
POSTS
It is now time to concrete the posts into position. We recommend that you put a half brick under the posts to spread the load and to
reduce movement while the concrete is setting. Check thoroughly with a spirit level before, during and immediately after concreting.
The downpipes can now be attached to the gutter outlets ('pops') and to the posts, using the downpipe straps.
The adjustable construction props should be left in place for at least 2 to 3 days after completion to ensure that the concrete has
set properly.
MAINTENANCE
Failure to maintain a regular maintenance programme may result in a significantly reduced lifespan (refer to the “Selection Use &
Maintenance of Stratco Steel Products" brochure).
Your new verandah or carport should receive a wash and wipe down with a soft broom, mop or sponge as frequently as you should wash
your car to maintain its duco. Washing should occur at least every 6 months and more frequently in coastal or industrial areas. Stratco
steel products which are regularly washed by rain require no additional maintenance.
In corrosive industrial or marine environments, the manufacturer recommends the use of colour steel with a stainless steel base.
Contact Stratco for further details.
FIG. 14: ROOFING TO TRUSS
CONNECTION
FIG. 13: ROOFING TO BACK
CHANNEL CONNECTION