On a flat protected surface, lay 1x
gate side frame
with slotted spacer infill
and rest against a padded
stop and tap
slats
into place.
Elevate the
slats
&
gate side frame
on two padded
bearers to allow the second
gate side frame
to be
attached.
Engage the second
gate side frame
to the
slats
and
tap the frame until all the slats are fully engaged.
TIP: Start at one end and work slats in from one end
to the other.
GATE SLAT POSITIONING
· 2x at top of gate
· 1x at middle of gate
· 1x at bottom of gate
NOTE: 4x gate slats must be used even when gate height is reduced
Check measure diagonals to ensure the gate is square.
Screw all
gate slats
(4 screws per slat).
NOTE: Set cordless drill to “screw function” to avoid breaking screw heads.
Slide in the 2x
outer infills
into position to hide
screw heads.
3
4
!
5
6
7
PEDESTRIAN GATE
ASSEMBLY GUIDE