RECEIVING THE PRINTER
INSPECT CRATE FOR DAMAGE
Before opening the shipping crate, inspect the crate for signs of exterior damage.
Report evidence of excessive damage to Stratasys and the shipping company.
PREPARING FOR INSTALLATION
UNPACKING THE PRINTER
The work area for unpacking the system should be 36-40 inches (90-100 cm) high for the single material bay
option, and 46-50 inches (117-127 cm) high for additional material bay option.
For detailed unpacking and setup instructions, refer to the uPrint SE and uPrint SE Plus User Guide.
SITE PREPARATION CHECKLIST
ELECTRICAL INSTALLATION REQUIREMENTS
A dedicated outlet of 100-240V ~12-7A 50/60 Hz 1200W has been installed.
The grounded electrical outlet is within 2 meters (80 inches) of the printer.
The grounded electrical outlet is able to accept either a Euro or US power cord plug.
The LAN connection is within 4 meters (14 feet) of the printer.
ENVIRONMENTAL REQUIREMENTS
The site’s environmental temperature is between 59°F to 86°F (15°C to 30°C).
The site’s environmental humidity is between 30% to 70%, non-condensing.