background image

Copyright

Copyright © 2019-2020 Stratasys. All rights reserved. 

No part of this document may be photocopied, reproduced, or translated into any human or computer language in any 
form, nor stored in a database or retrieval system, without prior permission in writing from Stratasys. This document may 
be printed for internal use only. All copies, shall contain a full copy of this copyright notice.

www.stratasys.com

Trademarks

Stratasys,and Stratasys J826 are trademarks of Stratasys and/or subsidiaries or affiliates and may be registered in 
certain jurisdictions. All other product names and trademarks are the property of their respective owners.

Liability

Stratasys shall not be liable for errors contained herein or for incidental or consequential damages in connection with the 
furnishing, performance, or use of this material. Stratasys makes no warranty of any kind with regard to this material, 
including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose. It is the 
responsibility of the system owner/material buyer to determine that Stratasys material is safe, lawful, and technically 
suitable for the intended application as well as identify the proper disposal (or recycling) method consistent with local 
environmental regulations. Except as provided in Stratasys' standard conditions of sale, Stratasys shall not be 
responsible for any loss resulting from any use of its products described herein.

Disclaimers

Customer acknowledges the contents of this document and that Stratasys parts, materials, and supplier are subject to its 
standard terms and conditions, available on http://www.stratasys.com/legal/terms-and-conditions-of-sale, which are 
incorporated herein by reference.

The specifications and/or information on which this document is based are subject to change without notice.

Feedback

If you have any questions or comments about the way information is presented in this document, or if you have any 
suggestions for future editions, please send a message to

[email protected]

.

DOC-18005 Rev. E

Содержание J826

Страница 1: ...DOC 18005 Rev E 3D Printing System Site Preparation Guide Stratasys J826...

Страница 2: ...he implied warranties of merchantability and fitness for a particular purpose It is the responsibility of the system owner material buyer to determine that Stratasys material is safe lawful and techni...

Страница 3: ...1 Electrical Requirements 12 Power 12 Grounding 12 Circuit Breaker 13 Residual Current Device RCD 13 Power Connection 13 UPS Uninterrupted Power Supply 13 Communication Lines 15 Local Area Network 15...

Страница 4: ...Cleaning Solvent 19 Site Preparation Checklist 20 DOC 18005 Rev E 2019 2020 Stratasys All rights reserved 4...

Страница 5: ...st be met before the installation date The Site Preparation Checklist should be submitted to your Stratasys representative Shipping will be arranged after the checklist is received by Stratasys Non co...

Страница 6: ...D cm W H D inch Weight kg lb Printer 87 120 73 5 34 2 47 2 29 234 kg 516 lbs Materials cabinet 67 x 110 x 64 26 4 x 43 3 x 25 2 152 kg 335 lbs Table 1 Size and weight W Width H Height D Depth The dept...

Страница 7: ...ill advise regarding these matters Note Only Stratasys certified Customer Support Engineers are authorized to unpack and install equipment supplied Shipping Pallet The following table shows the approx...

Страница 8: ...e printer The installation location must be accessible from the unloading area The customer is responsible for unloading the printer from the truck and transferring it to the installation location Min...

Страница 9: ...Figure 3 Printer center of gravity Stratasys J826 Shipment and Delivery DOC 18005 Rev E 2019 2020 Stratasys All rights reserved 9...

Страница 10: ...t be extended or replaced with a longer cable Clearance around and above the printer should ensure convenient access and servicing The area around the printer should remain dry at all times Do not pla...

Страница 11: ...quirements To view the specifications for client workstations go to http help grabcad com print system requirements Stratasys J826 Workstation Requirements DOC 18005 Rev E 2019 2020 Stratasys All righ...

Страница 12: ...0 240 VAC 50 60 Hz 7 A 1 phase Printer short circuit rating 1000 A If the power at the facility does not support the above specifications contact your Stratasys specialist Important The diagram below...

Страница 13: ...electrician The following electrical outlets are required one outlet behind the printer three outlets close to the printer for the workstation monitor and servicing equipment UPS Uninterrupted Power...

Страница 14: ...PS systems meet the above requirements Eaton PW9130G3000T 220 240 VAC Eaton PW9130L2000T XL 100 120 VAC 1Single phase 50 60 Hz 2Defined as the input to output ratio of the UPS 3UPS units that only con...

Страница 15: ...shown in the following diagram Figure 6 Network installation The connection to the local network should be established prior to printer installation Telephone A telephone near the printer is recommen...

Страница 16: ...and relative humidity should not exceed the limits listed in the table below Range Temperature 18 C to 25 C 64 5 F to 77 F Relative humidity 30 70 non condensing Table 6 Room temperature and relative...

Страница 17: ...k of the printer and connected to an external ventilation fan with a duct air expelled from the printer is discharged directly outdoors as shown in the figure below Required Suction at the Exhaust Ada...

Страница 18: ...ter oil trap must be installed on the air gun used for cleaning the printer The recommended air pressure is 5 7 bar 70 90 PSI Fire Safety Equipment A gas based fire extinguisher is recommended in case...

Страница 19: ...nts for handling and storing specific materials appear in the Material Safety Datasheet MSDS included with each material Note Non compliance with these recommendations might result in reduced shelf li...

Страница 20: ...cribed in this document Fill in the information requested in the checklist and submit it to your Stratasys representative An installation date will be scheduled after the checklist has been approved b...

Страница 21: ...www stratasys com ___ THE 3D PRINTING SOLUTIONS COMPANY ISO 9001 2008 Certified...

Отзывы: