PAGE 82 — SFCG1 CONCRETE SAW— OPERATION & PARTS MANUAL — REV. #2 (03/10/04)
Effective: July 15, 2003
TERMS AND CONDITIONS OF SALE — PARTS
Effective: July 1, 2000
TERMS AND C
ON
DITI
ON
S OF
SALE — PARTS
PAYMENT TERMS
Terms of payment for unit sales are 2% 15
days net 30 days from date of invoice unless
otherwise specifically stated on our invoice.
Parts invoices have terms of net 10 days.
Minimum parts billing is $15.00 net
.
Applicable discounts will be computed on
merchandise value only. Late charges will be
assessed at prevailing rates. Cash discounts
cannot be taken on current billings if any
previously billed amounts are past due.
FREIGHT POLICY
Freight policy is established to offer customers
every advantage possible. Due to bulk freight
ratings on some equipment and other shipping
considerations, freight policies differ by
equipment type. Actual back freight may be
charged for shipments originating from other
than specified FOB warehouses.
See Freight
Policy for details.
All STOW domestic sales are FOB nearest
available designated MQ/STOW warehouse.
Export orders are ex-works factory located in
Carson, CA or Boise, ID.
Additions to orders already shipped cannot be
accepted for freight minimums.
Should STOW elect to make partial shipments
of an order originally complying with the “freight
allowed” requirements, transportation charges
will be absorbed by STOW on any subsequent
shipment applying to that order.
All other orders will be shipped collect or prepaid
with charges added to the invoice. STOW’s
responsibility ceases when a signed manifest
has been obtained from the carrier, and any
claim for shortage or damage must be settled
between the consignee and the carrier.
Parts:
FOB Carson, California or Boise,
Idaho.
See Freight Policy for details and
additional discounts
.
DROP SHIPMENTS
STOW reserves the right to refuse Drop
Shipments outside the normal service area of
the purchasing dealer.
FIELD WAREHOUSES
Field Warehouses are currently located in
California, Georgia, Idaho, Iowa, and New
Jersey
SPECIAL EXPEDITING SERVICE
The higher of a $35.00 surcharge or actual
costs will be added to the invoice for special
handling, including bus shipments, or in cases
where STOW personnel must personally deliver
the equipment or parts to the carrier.
RETURNED GOODS POLICY
1. A Returned Material Authorization (RMA)
must be approved by STOW prior to
shipment. Approvals for returned goods
must be with just cause and are at the
sole discretion of STOW. A copy of the
Authorization must accompany the ship-
ment to the designated Warehouse.
2. Parts being returned must be listed as
currently supplied on the current parts list.
3. Parts must be in new and resalable
condition in the original package, with part
numbers clearly marked.
4. Units and accessories must be current
models in the latest price list and in new
and resalable condition.
5. Special order items are not returnable for
credit.
6. Credit on returned parts and units will be
issued at actual dealer net price at time of
purchase less 15% restocking charge.
7. All returned shipments are to be made to
the STOW designated receiving point,
freight prepaid at the sender’s expense.
STOW CONSTRUCTION EQUIPMENT
A DIVISION OF MULTIQUIP
HANOVER MILL
FITZROY STREET
ASHTON-UNDER-LYNE
LANCASHIRE, OL7 OTL
UNITED KINGDOM
PH. 0161-339-2223
FAX. 0161-339-3226
E-MAIL: [email protected]
www.stowmfg.com
Atlanta • Boise • Newark • Quebec, Canada
Manchester, UK • Rio de Janeiro, BR • Puebla, MX
The sender will be notified of any material
received that does not meet the above
provisions. Such material will be held for 30
days from notification pending instructions. If a
reply is not received within 30 days, the material
will be returned to the sender at his expense
with no credit issued.
PRICING, REBATES AND
SPECIFICATIONS
Every effort will be made to provide adequate
notice of changes; however, prices and
equipment specifications are subject to change
without notice.
Price changes are effective on a specific date
and all orders received on or after that date will
be billed at the revised price.
Rebates for price reductions and added charges
for price increases will not be made for stock in
dealer inventory at the time of a price change.
STOW reserves the right to quote and sell direct
to Government agencies and to Original
Equipment Manufacturer accounts who use our
products as integral parts of their own products.
LIMITATION OF SELLER’S LIABILITY
STOW shall not be liable hereunder for damages
in excess of the purchase price of the item with
respect to which damages are claimed and in
no event shall STOW be liable for loss of profit
or good will or for any other special,
consequential or incidental damages.
LIMITATION OF WARRANTIES
There are no warranties, express or implied,
made by STOW. hereunder on Products
manufactured or distributed by it except the
warranty against defects in material and
workmanship on new Products to the original
purchaser, as set forth in the STOW New
Product Limited Warranty.
Terms and Conditions of Sale
STOW Construction Equipment
Содержание SFCG1 SERIES
Страница 2: ......
Страница 33: ...SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 PAGE 33 NOTE PAGE...
Страница 50: ...PAGE 50 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 CAMSHAFT ASSY HONDA GX200QXC9 CAMSHAFT ASSY...
Страница 54: ...PAGE 54 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 CONTROL ASSY HONDA GX200QXC9 CONTROL ASSY...
Страница 64: ...PAGE 64 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 FAN COVER ASSY HONDA GX200QXC9 FAN COVER ASSY...
Страница 66: ...PAGE 66 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 FLYWHEEL ASSY HONDA GX200QXC9 FLYWHEEL ASSY...
Страница 68: ...PAGE 68 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 FUEL TANK ASSY HONDA GX200QXC9 FUELTANK ASSY...
Страница 72: ...PAGE 72 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 MUFFLER ASSY HONDA GX200QXC9 MUFFLER ASSY...
Страница 74: ...PAGE 74 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 PISTON ASSY HONDA GX200QXC9 PISTON ASSY...
Страница 80: ...PAGE 80 SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 LABELS ASSY HONDA GX200QXC9 LABELS ASSY...
Страница 83: ...SFCG1 CONCRETE SAW OPERATION PARTS MANUAL REV 2 03 10 04 PAGE 83 NOTE PAGE...