
3. Make sure sump is free of string, cloth, nails,
gravel, etc. before installing pump.
4. Pump is to be connected to a properly
grounded, grounding type receptacle only.
5. Do not remove ground pin from electrical plug.
6. Do not use an extension cord.
7. Connect to separate electrical circuit taken
directly from main switch.
8. Use steel or plastic pipe for all connecting lines
between pump and sewer outlet.
note: Some city regulations do not allow
installing a pump with plastic pipe. Check local
regulations.
9. In applications where the pump may sit idle
for months at a time, it is recommended that
the pump(s) be cycled every month to ensure
the pumping system is working properly when
needed.
10. A check valve should be installed in discharge
pipe at least 12" above the discharge outlet of
the pump.
11. For greater protection, an audible alarm should
be used with all pump installations to indicate a
high water condition exists.
,RQ_6WRUP3UR
SP50
OS50
Submersible Effluent Pump
OPERATION MANUAL
Dated: 08/04/10
Supersedes: None
Document No.: 23833A669
Page
2
of 4