background image

ANCHORING THE CONTAINER 

Make sure you have: 

Welder.

Cement.

Four 3” x 3” x 6 feet ¼” Square steel  angle

1. As shown in the diagram 1, make a 3 ft deep hole right beside one of the front and

opposite rear corners of the container, in which the 6ft 

square steel

 will be installed.

2. Insert the 6ft 

square steel 

into the hole, making sure 3ft is below the surface

completely laying on the side of the containers.

3. Weld the 

square steel

 to the 2 containers.

4. Pour cement in the holes to make sure the 

square steel

 won’t move.

5. Repeat the previous steps on the corners located in the opposite rear side.

Securing the containers to the floor is crucial, that way the containers won’t shift

under harsh weather conditions, thus avoiding the shipping container canopy roof top

of getting damaged.

Diagram 1 

Содержание C4060R

Страница 1: ...1 Shipping Container Roof Single Truss Round Style Model C4060R 40 x60 x15 6 7 arch space Assembly Instructions...

Страница 2: ...2 Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment...

Страница 3: ...steel into the hole making sure 3ft is below the surface completely laying on the side of the containers 3 Weld the square steel to the 2 containers 4 Pour cement in the holes to make sure the square...

Страница 4: ...of Single truss framing Customer responsibility 4 It s the owner s responsibility to shovel snow off the canopy rooftop 5 All containers need to be anchored to the ground in each opposite corner sides...

Страница 5: ...and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected...

Страница 6: ...ower Tensioning Tube for Roof Cover 6 1 pcs set 2 sets 9 Ratchet for tensioning of roof cover four corners 4 10 Tube Clip with bolt M10x50 for support tube 24 11 Bolt M10x90 for swaged tube 160 12 Car...

Страница 7: ...Make sure to fix the container firmly before installing the shelter Framework Installation 1 Weld base plates No 6 No 7 to the top of container Please refer to the diagram Figure 1 to mark the positi...

Страница 8: ...se plate 4 When 2 arches are in place connect purlin No 4 between them by carriage bolt M12x100 No 12 Please note the direction of the bolt do not leave the shaft outside where the fabric will rest By...

Страница 9: ...both ends 2 Use rope No 15 to tighten roof cover to end arches The rope should be cut as your requirements when using When the cover is tidy and ready drive the ratchet tie down forth and back and the...

Страница 10: ...10 Roof Cover Now your installation is completed...

Отзывы: