1
Shipping Container RoofSingle Truss Round Style
Model# C2620R 26’x20’x10’
(6’7’’ arch space)
Assembly Instructions
Страница 1: ...1 Shipping Container Roof Single Truss Round Style Model C2620R 26 x20 x10 6 7 arch space Assembly Instructions...
Страница 2: ...2 Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment...
Страница 3: ...and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected...
Страница 4: ...steel into the hole making sure 3ft is below the surface completely laying on the side of the containers 3 Weld the square steel to the 2 containers 4 Pour cement in the holes to make sure the square...
Страница 5: ...of Single truss framing Customer responsibility 4 It s the owner s responsibility to shovel snow off the canopy rooftop 5 All containers need to be anchored to the ground in each opposite corner sides...
Страница 6: ...Joist 8 4 Purlin 15 5 Support Tube 12 6 Base Plate 6 7 Base Plate 2 8 Lower Tensioning Tube for Roof Cover 4 1 pcs set 2 sets 9 Winch for tensioning of roof cover four corners 4 10 Tube Clip with bolt...
Страница 7: ...7 12 Carriage Bolt M10x80 for purlin 20 13 End Plug 4 14 Belt for Winch on base plate 8 15 Knitting Rope for roof cover 2 bundles 1 pack 16 Roof Cover 1 17 Duct Tape 1 18 Expansion Bolt 24...
Страница 8: ...into the base plate No 6 No 7 and fasten it by bolt M8x70 No 11 then try to put the other end into opposite base plate 4 When 2 arches are in place connect purlin No 4 between them by carriage bolt M1...
Страница 9: ...9 Arch No 1 to No 4 Installation Purlin and Support Tube Installation...
Страница 10: ...oof cover to end arches The rope should be cut as your requirements when using When the cover is tidy and ready drive the winch tie down forth and back and then roof cover is tightened Pull the band i...