R2W PLUS
22
Line
Start traverse surveying
Offset
Start offset measurement (ANG.Offset, DIST Offset,
PLANE Offset, CYL.Offset) function
Coor Order
Set displayed coordinate order as NEZ or ENZ
Save Coor Save coordinate of instrument station or not
Ang.Unit
Set Ang.Unit as DMS, GON, MIL
Dist Unit
Set Dist Unit as m, UsFeet, IntFeet
Stop
Stop distance measurement
Exit
Exit basic measurement program
4.3 Angle measurement mode
4.3.1 Horizontal angle(right angle) and vertical angle measurements
Firstly, make sure the operation is under angle measurement mode.
Operation steps
Keys
Display
①
Collimate the first target
A
Collimate A
②
Set horizontal angle as zero
for
target
A.Click
the
“S.Zero” button, and choose
“OK” in the popup dialog
box.
【
S.Zero
】
【
OK
】