background image

- 15 -

OPERATION

125CM

the engine starts, adjust the throttle.  Always operate

the engine at full throttle when under load.  Adjust

engine speed so drum is turning between 16 - 20 RPM.

NOTE:

 

 These starting instructions are general

guidelines only.  Since many engine options are

available on the manufacturer's CM mixers, consult the

ENGINE MANUAL included with this unit for specific

instructions.

ELECTRIC MOTORS - 

Use the proper size (3) wire

(grounded) extension cord, conforming to the National

Electric Code and Local Ordinances.  DO NOT use (2)

wire extension cord.  Check any extension cord which

you plan on using carefully for broken connectors, bare

wires and damaged insulation.  DO NOT use any cord

found to be in poor condition.  Make sure the extension

cord is not routed through standing water and that all

the connections are tight.  Use the shortest extension

cord possible.  Turn motor on.

TO STOP THE ENGINE / MOTOR

GASOLINE ENGINES - 

Depress grounding switch

located on stationary cowl half and hold down until

engine stops completely.  Consult the ENGINE

MANUAL included with this unit for specific

instructions.  If the mixer is to be left unattended for

any length of time, close the fuel valve under the gas

tank.

ELECTRIC MOTORS

 - Turn the motor off.  If the

mixer is to be left unattended for any length of time,

disconnect the power cord.

OPERATION

Start the engine / motor as previously instructed and

allow gasoline engines to reach operating temperatures.

Close the engine cowl.  NEVER operate the mixer with

cowl open.

With drum operating between 16 - 20 RPM's the mixer

is now ready for the addition of the concrete mix.  For

best results proceed as follows:

1. Pour the required amount of water into

drum.

2. Add the required amount of gravel.

3. Add the required amount of cement.

4. Add the required amount of sand.  By

adding the water and gravel first the

drum will be kept clean and a good

tumbling action will be maintained when

cement and sand will be added.

To discharge concrete, grasp handwheel firmly with

one hand and release tilt brake by pushing up on the tilt

handle with the other.  See diagram below.

To prevent accidental discharge, never release brake

without holding the handwheel firmly.  Do not attempt

to grab the handwheel to stop an accidental discharge,

serious injury could result.  Always make sure that the

brake is fully engaged after discharge of concrete and

before reloading the drum.

NOTE:

 When servicing brake mechanism, bolt A

should be tightened so that approximately 17 - 18

pounds of force is required to release the brake.  This

will prevent accidental discharge due to vibration.

CAPACITIES

* Maximum batch size depends on mix and type of

aggregate used.

125CM

2 Bag

Total Drum

20 cu. ft.

Volume

Max Batch

12 cu. ft.

Size*

Содержание 125CM

Страница 1: ...MODELS 125CM REVISION A 3 99 P N 56391 This equipment has been designed and tested to meet the requirements of the Machinery Safety Directive 89 392 EEC and Amendments and therefore carries the CE Mar...

Страница 2: ...ocations West Palm Beach 561 964 4949 Orlando 407 291 3162 Tampa 813 248 2848 Need parts Check out our website at www discount equipment com Can t find what you need Click on this link http www discou...

Страница 3: ...SAFETY 9 13 OPERATIONS 14 17 Before Starting 14 Safety Chain Installation 14 Oil Levels and Lubrication 14 Hardware 14 Fuel 14 To Start the Engine Motor 14 15 To Stop The Engine Motor 15 Operation 15...

Страница 4: ...s and downtimes Always keep these instructions at the place of use of the machine Only operate the machine as instructed and follow these instructions Observe the safety regulations as well as the gui...

Страница 5: ...NOTE PAGE...

Страница 6: ...Batch Capacity Bags Batch Capacity cu ft Total Volume L x W x H Power Source 897 lbs w 11hp Honda 406 9 kg 1 1 2 2 bags 12 cu ft 34 cu m 19 8 cu ft 56 cu m 95 x 56 x 70 in 241 3 x 142 2 x 177 8 cm 2 h...

Страница 7: ...3 4 10 750 282 382 7 8 9 875 322 436 5 7 8 9 875 454 615 1 8 1 000 483 655 1 8 1 000 682 925 SAE GRADE 5 Fine Thread Zinc Plated SAE GRADE 8 Fine Thread Zinc Plated SIZE TORQUE SIZE TORQUE ft lbs Nm...

Страница 8: ...9 ZINC PLATED Coarse Thread Fine Thread SIZE Nm ft lbs Nm ft lbs M6 14 10 NA NA M8 34 25 35 26 M10 67 49 68 50 M12 117 86 125 92 M14 185 136 192 142 M16 285 210 295 218 M20 550 406 600 443 M24 950 701...

Страница 9: ...ormation provided to prevent personal injury or injury to others FOLLOW SAFETY INSTRUCTIONS Read all safety messages and decals in this manual and on your machine safety signs carefrully Keep decals i...

Страница 10: ...it off of the engine immediately and discard the rag in a safe place Do not operate the equipment if fuel or oil leaks exist repair immediately Never operate this equipment in an explosive atmosphere...

Страница 11: ...during the operation close and latch cowl immediately after starting Keep hands clothing and jewelry away from all moving parts Keep all guards in place including drum guards Never place your hands or...

Страница 12: ...exhaust fumes can cause sickness or death Warning Towing Warning Do not tow the mixer with the drum in the dump position Mixer may become unstable and tip over when hitting a curb pothole or other ob...

Страница 13: ...disposing of waste can threaten the environment and ecology Potentially harmful waste used with equipment include such items as oil fuel coolant brake fluid filters and batteries Use leakproof contai...

Страница 14: ...CTRIC THAT THE ELECTRIC CORD IS DISCONNECTED TO PREVENT ANYACCIDENTAL STARTING HARDWARE Check all hardware on mixer and engine motor before starting Consult the TORQUE CHART section of this manual and...

Страница 15: ...eft unattended for any length of time disconnect the power cord OPERATION Start the engine motor as previously instructed and allow gasoline engines to reach operating temperatures Close the engine co...

Страница 16: ...T INTO THE DRUM WHILE THE ENGINE OR MOTOR IS RUNNING WARNING WARNING ALWAYS DISCONNECT THE SPARK PLUG WIRE OR ELECTRIC CORD WHEN CLEANING INSIDE DRUM TOWING Before attempting to tow this mixer check t...

Страница 17: ...sprockets on chain drive models with a few drips of SAE 30 motor oil or any spray chain lube D MONTHLY Grease trunnions 2 places and drum spindle 2 places E YEARLY Repack 4 tapered roller bearings in...

Страница 18: ...ocations West Palm Beach 561 964 4949 Orlando 407 291 3162 Tampa 813 248 2848 Need parts Check out our website at www discount equipment com Can t find what you need Click on this link http www discou...

Отзывы: