93
B58FC1 0000000094 EN 002
INDEX
Index
3
3rd control circuit . . .. . .. . .. . .. . .. . .. . . 40
4
4th control circuit . . .. . .. . .. . .. . .. . .. . . 40
A
Aligning the front loader for mounting . . 48
Anti-lowering guard .. . .. . .. . .. . .. . .. . . 39
B
Ballasting .. . .. . .. . .. . .. . .. . .. . .. . .. . . 44
Base Control .. . .. . .. . .. . .. . .. . .. . .. . . 52
Basic functions . .. . .. . .. . .. . .. . .. . .. . . 34
Behaviour in case of emergency .. . .. . .22
C
Check before each start-up . .. . .. . .. . . 42
Cleaning . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 78
Comfort Drive . . .. . .. . .. . .. . .. . .. . .. . .41
D
Danger areas.. . .. . .. . .. . .. . .. . .. . .. . . 17
Danger due to emissions. .. . .. . .. . .. . . 12
Dangers during assembly for initial
operation .. . .. . .. . .. . .. . .. . .. . .. . .. . . 13
Dangers during loading work .. . .. . .. . .14
Dangers during maintenance .. . .. . .. . . 16
Dangers during packaging and
transport . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 13
Dangers when mounting and
dismounting the front loader. .. . .. . .. . . 13
Dangers when operating the front
loader .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 15
Dangers when picking up and putting
down implements. . .. . .. . .. . .. . .. . .. . . 14
Dismounting the front loader .. . .. . .. . .83
Disposal . .. . .. . .. . .. . .. . .. . .. . .. . .. . .84
Documentation overview . .. . .. . .. . .. . .. 5
Driving on roads .. . .. . .. . .. . .. . .. . .. . .71
Dumping . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 36
E
EC conformity. . .. . .. . .. . .. . .. . .. . .. . .. 9
Electrical dangers . .. . .. . .. . .. . .. . .. . .12
Equipment variations . .. . .. . .. . .. . .. . . 27
Euro change frame .. . .. . .. . .. . .. . .. . . 29
F
Faults .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 74
Float position.. . .. . .. . .. . .. . .. . .. . .. . . 37
Foreseeable misuse. . .. . .. . .. . .. . .. . . 10
G
Gas-hydraulic Comfort Drive .. . .. . .. . . 41
H
Hydraulic dangers . .. . .. . .. . .. . 11, 12, 16
hydraulic lines . .. . .. . .. . .. . .. . .. . .. . . 30
I
Indicator for implement position .. . .. . . 38
Initial operation. .. . .. . .. . .. . .. . .. . .. . . 42
Intended use .. . .. . .. . .. . .. . .. . .. . .. . . 10
L
levelling . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 70
Lifting .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 35
Lowering .. . .. . .. . .. . .. . .. . .. . .. . .. . . 35
Lubrication points on the catch hooks. . 78
Lubrication points on the H . .. . .. . .. . . 79
Lubrication points on the P . .. . .. . .. . . 80
Lubrication schedule . .. . .. . .. . .. . .. . . 80
M
Mechanical dangers. . .. . .. . .. . .. . .. . ..11
Mounting kit for tractors . .. . .. . .. . .. . . 28
Mounting the front loader .. . .. . .. . .. . . 46
O
Operating the implement locking
mechanism on skid-steer change
frames .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . . 59
Operating the parking supports. .. . .. . . 54
Operating the plug-in coupling . .. . .. . . 55
Operational limits . .. . .. . .. . .. . .. . .. . . 10
P
Parallel motion . .. . .. . .. . .. . .. . .. . .. . . 38
Passing through low clearances .. . .. . . 72
PinOn lubrication points . .. . .. . .. . .. . . 79
Plug-in couplings. . .. . .. . .. . .. . .. . .. . . 31
Preparations on the tractor . .. . .. . .. . . 43
Protective and safety equipment.. . .. . . 17
Putting down the implement. .. . .. . 67, 69