Commissioning
Prepare boiler for first startup
20
A
M
H
B
C
D E F
I
L
G
A
Legend:
A On/off
switch
B Return
(ESC)
C Room temperature control
D Confirmation
(OK)
E Manual
mode
F
Chimney sweeper mode
G Info
mode
H Reset button
I
Operation mode heating zone(s)
L Display
M Operation mode DHW
Preparation for first startup
Open the gas supply;
Enable the power supply to the boiler;
Switch on the boiler with the on/off
switch (A);
Make sure the boiler is in standby
mode (
K
);
Check the pump operation: make
sure the pump runs in the right
direction;
Release all air from the pump motor.
It‘s recommended to put the boiler on
50% load after the first startup, as this
is the best starting point to do a proper
combustion analysis. This can be done
with the following procedure:
Push button I >3 Sek, the boiler goes
into controller Stopp mode.
Push the Info button (G), the actual
boiler load (%) appears in the display;
Choose „set up“ (confirm with OK
button), now the boiler load can be
changed by rotating the wheel (C)
and confirming the 50% setting with
the OK button.
After checking the combustion values
(see next page), the controller Stopp
mode can be stopped by pushing the
control mode button (I) >3 Sek.