5

10. Connect free end of mix pump hose to "4 way Tee"
     as shown in Figure D.  When all connections are
     complete the "4 way Tee" must be lower than the
     black pump housing.

C. Connect 1/2 inch (1.27 cm) I.D. plastic food grade

tubing to the check valve and then to the mix con-
tainer. Observe check valve flow arrow. Secure with
hose clamps.

D. Connect 1/2 inch (1.27 cm) ID plastic food grade

tubing between the large port of air/mix tee and
refrigerated mix transfer line. Secure with large hose
clamp or equivalent.

CAUTION

AIR/MIX TEE MUST REMAIN BELOW THE BLACK
COVER/CLAMP. IF THE TEE IS ABOVE THE PUMP  MIX
WILL DRAIN TO THE AIR COMPRESSOR RESULTING
IN PUMP DAMAGE.

E. Plug mix pump into a 115 volt grounded receptacle.

WARNING

TO MINIMIZE SHOCK HAZARD, THE REMOTE MIX
PUMP MUST BE PLUGGED INTO A PROPERLY
GROUNDED ELECTRICAL RECEPTACLE WITHOUT THE
USE OF A GROUND ADAPTER PLUG.

2.4  MIX PUMP CHECK OUT

Before using, the U3 Mix Pump should be thoroughly
cleaned. This is necessary to remove any foreign
materials that may be present.

A. The over-run adjustment is preset at the factory.  If an

adjustment becomes necessary, refer to Section 4.1.

B. Check for air leaks by placing the suction line into

two gallons of cold water. Place the freezer switch in
the OFF position. Close the spigot and freezer air
vent. Place mix pump switch in the ON position and
allow the system pressure to build up and pump to
shut OFF automatically. Leave the pump on for ten
minutes.

During this time, do not open spigot or freezer air
vent.  If pump does not automatically start again
during this period, the system is free of leaks.  If the
pump does start, there is a leak in the system.
Locate leak by applying a liquid detergent or bubble
solution with a small brush to all tubing connections
and o-ring seals. Correct as required.

Figure 3

Mix Pump Installation

OPTIONAL
MOUNTING
KIT

Figure D

CHECK VALVE

Check
 Valve

Содержание U3-02

Страница 1: ...Model U3 02 OPERATORS MANUAL Manual No 513557...

Страница 2: ......

Страница 3: ...built prior to date of change DO NOT ATTEMPT to operate the machine until instructions and safety precautions in this manual are read completely and are thoroughly understood If problems develop or q...

Страница 4: ...ecific safety information the following safety defini tions are provided to assist the reader The purpose of safety symbols is to attract your at tention to possible dangers The safety symbols and the...

Страница 5: ...TION INSTRUCTIONS 7 3 1 Safety Precautions 7 3 2 Pump Motor Switch 7 3 3 Operation Of U3 Mix Pump 7 3 4 Cleaning 8 3 5 Disassembly and Inspection of Removable Parts 8 3 6 Sanitizing and Startup 9 3 7...

Страница 6: ...kup Hose 4 C Pickup Hose 4 3 Mix Pump Installation 5 D 4 wayTee Connection 5 4 Pump Motor Switch 7 5 Mix Pump Operation 8 6 Removing Parts 8 7 Overrun Adjustment 11 8 Reposition Mix Pump Hose 12 9 Pum...

Страница 7: ...the freezing cylinder of your freezer quickly conveniently Second the U3 Pump precisely injects a preset amount of air into the mix maintaining overruntoassuremaximumprofitability Third itpressur izes...

Страница 8: ...2...

Страница 9: ...mplete drainage Fig 2 B The product at the mix pump and in transfer lines must be maintained below 41 F 5 C 2 3 INSTALLATION A Follow the steps below to install the mix pump in an upright position on...

Страница 10: ...ins to feed See Figure A Figure A 4 Allow the hose to feed itself thru the pump until 6 remains on the entering side 5 Turn pump off 6 Connect mix pump hose to pickup hose adapter using small hose cla...

Страница 11: ...ROUND ADAPTER PLUG 2 4 MIX PUMP CHECK OUT Before using the U3 Mix Pump should be thoroughly cleaned This is necessary to remove any foreign materials that may be present A The over run adjustment is p...

Страница 12: ...6...

Страница 13: ...OTOR SWITCH The PUMP MOTOR switch Fig 4 is located on the mix pump assembly When the pump motor switch is placed in the ON position the mix pump motor will be actuated to pumpmixintothefreezercylinder...

Страница 14: ...he clean position and agitate 5 10 minutes maximum 2 Remove suction tube from mix container Draw off the mix remaining in freezer barrel 3 Pump 2 gallons 7 5 liters of cold potable water thru freezer...

Страница 15: ...deddisinfectingproductsandproce dures The frequency of cleaning must comply with local health regulations Use a solution containing 100 PPM of free available chlorine Use Stera Sheen Green Label Sanit...

Страница 16: ...s on the container and pump through the mix line B Cut a piece of sponge slightly larger than the inside diameter of the mix line Place the sponge inside the mix line and force through with tap water...

Страница 17: ...The rocking arm down ward travel is limited by a stationery cam On the face of the cam there is an overrun setting indicator plate numbered 3 thru 8 and an adjustment knob Fig 7 D The overrun setting...

Страница 18: ...maining hose is removed from the pump Pressures for Stoelting Freezers Cut out 24 3 PSIG For Duke Freezers Cut out 30 3 PSIG 19 ROLLER DISCHARGESIDE COVER CLAMP PICKUP SIDE CUTLINE MEASUREMENT MIX PIL...

Страница 19: ...SSURE IN THIS CASE TURN THEPUMP OFF DRAW 2 3 PINTSTO REDUCE SYSTEM PRESSURETO ZERO TURN PUMP ON PURGEREMAINING AIR IN MIX BAG AND PICK UPHOSE IMPORTANT Before connecting the pick up hose to the mix ba...

Страница 20: ...t water Thoroughly clean all mix from pump See Sec 4 2 for hose replacement Lubricate squeeze roller bearings see Item 10 below 9 PUMP HAS POOR CAPACITY Lift and run limits are exceeded Pump is limite...

Страница 21: ...owinginformation A Model number of equipment B Serial number of Model Stamped on nameplate C Part number part name and quantity needed Many part names and numbers are listed in this manual NOTE Minimu...

Страница 22: ...ch Allen 5 32 11 1995611 1 Wiring Diagram U3 Pump 12 717917 SV 1 Switch Pressure Stoelting 12 717919 SV 1 Switch Pressure Duke 13 3170824 1 Mounting Bracket 14 3171850 1 Splash Guard 15 4177692 1 Pump...

Страница 23: ...17 OPTIONAL MOUNTING KIT SEESERVICEREFERENCE PAGE19...

Страница 24: ...18...

Страница 25: ...19...

Страница 26: ...20...

Страница 27: ...21...

Страница 28: ...22...

Страница 29: ...23...

Страница 30: ......

Страница 31: ...es are subject to the conditions that Buyer a signs and returns to Stoelting upon installation the Checklist Warranty Registration Card for the affected equipment b gives Stoelting prompt written noti...

Отзывы: