background image

Electrical Supply

Installation must be carried out by a qualified electrician in 

accordance with BS 7671:2008 Wiring Regulations.

230/240V AC 50/60Hz mains supply to a suitable SELV 

LED Driver.

Site conditions: LED equipment is more susceptible to 

static damage and over voltage than previous technology. 

Before handling or connecting to the mains supply ensure 

that all Stoane Lighting (SL) products are protected from 

static discharge and that the mains supply is to regulation. 

(230V +10 -6%)

This fitting is supplied with a Xicato LED module. Refer to 

the fitting label for the module version and wattage. More 

information on the module can be found at 

www.xicato.com/support

Mains cables must be double insulated, strain relieved 

and separated from E.L.V output cables.

If using the Xicato XTM Module;

This unit requires a constant current driver. 700mA Max.

If using the Xicato XIM Module;

This unit requires a 48V constant voltage PSU. 

 

 

 

Observe polarity:

Positive (+) is marked as RED.

Incorrect supply or reverse polarity can cause irreparable 

damage.

All connections must be made before switching on mains.  

If the supply is energised prior to making the connections 

to the fitting then the resulting surge will damage the LED.

Maintenance:

All lighting equipment is delicate and easily damaged

through misuse or inappropriate installation (mechanical

or electrical). Repairs and replacements may cause

delays and will be chargeable. Contact SL for support if

required.

All Stoane Lighting products are covered by a five year

Warranty and a 25 year Duty of Care. Products are

designed to be upgraded, adapted and refreshed using

our comprehensive ReNew service. For more information

on our ReNew service and for full Warranty terms and

conditions visit stoanelighting.com or contact us at the

address shown.

 

The light source contained in this luminaire shall only be 

replaced by the manufacturer or his service agent or a 

similar qualified person.

 

Installation

Check that the mounting surface is suitable for the 

installation of this fitting. For hard ground some 

preparation may be required for spike installation.

Step 1  Make mains connections to SELV LED driver  

 

and extra low voltage connections to the  

 fitting. 

Step 2  Push the spike on the fitting into the ground  

 

until it securely stands. Do not apply force to  

 

the head when placing in the ground. 

 

Adjust the pan and tilt by loosening the locks  

 

using a 2.5mm Allen key. Tighten once all  

 

adjustments are made.

After opening the sealed portion of the luminaire for 

any reason, SL recommends running the fitting for 15 

minutes with the lid open to expel moisture before 

closing it up. This will prevent condensation on the 

lens and protect the fitting from corrosion.

Ensure supply driver and connectors are housed 

indoors OR in a suitably IP rated enclosure. Cable 

ends must be suitably waterproofed. Inspect supply 

cables before installation to ensure there is no 

damage which will allow water to enter the fitting. 

Care must be taken when handling any ingress 

protection seals, glands or "O" rings to ensure they 

are kept clean, unblemished and replaced exactly in 

their required location and suitably fastened home. 

The IP rating stated is applicable only when the fitting 

has been installed as per these instructions. 

WARNING: Do not look at exposed LED lamps in 

operation. Eye injury can result.

Cleaning:      

Fully isolate the fitting and allow to cool.

Clean the fitting with a slightly damp lint free cloth 

from a mild solution of soap and water. The fitting 

must be completely dry before reconnecting power.

Incompatible or abrasive chemicals can damage the 

fitting, contact SL for advice if required.

Frog X Spike.pdf   2   09/03/2021   13:10:29

Отзывы: