REVOLUTION 2.0
USER MANUAL
Страница 1: ...REVOLUTION 2 0 USER MANUAL...
Страница 2: ...Sesh Technologies Manufacturing Inc 3223 North Market Street Spokane WA 99207 Phone 509 204 3164 Web www stmcanna com View Training Videos at bit ly revolution training REVOLUTION 2 0 USER MANUAL...
Страница 3: ...ency Procedures Touch Screen Operation Auger Speeds Chute Particle Screen Maintenance Changing Particle Screen Changing Blades Hopper Cleaning Procedure Troubleshooting Terms of Business PAGE 2 PAGE 3...
Страница 4: ...1 6 Lid 10 Auger Motor 8 Touch Screen Control 7 E Stop Button 11 Power Lockout Button 12 Lower Back Door Panel 10 Top of Back Door Panel 9 Auger Bearings FRONT OF MACHINE BACK OF MACHINE Revolution G...
Страница 5: ...k Certified Electrician for Installation Needs 3HP UL Listed Long Life Cycle Small Footprint Approx 220 lbs 30 L x 65 H x 22 1 4 W Holds 21 Liquid Gallons Four 5 Gallon Buckets of Material Up to 50 lb...
Страница 6: ...Resistive Touch Control Panel Low Med High Speed Start Stop Auger On Off Time Delay Pop Up Error Messages Standard Service Data for Clogs or E Stop Conditions OSHA Compliant Sliding Back Door for Eas...
Страница 7: ...o ensure it has not been damaged during shipping Make sure all the correct parts are included and match your invoice Please contact us if you have missing or damaged items PAGE 5 GETTING STARTED 4 Arm...
Страница 8: ...un time and 3 seconds off time to prevent clogging If material is too dry auger can run for longer but can remain at 3 seconds of run time ALWAYS TURN OFF AND UNPLUG MACHINE BEFORE CLEANING OR SERVICI...
Страница 9: ...buttons are not pressed it is most likely a trigger of the limit safety switch refer to page 12 There are four safety switches located in the machine that will display the emergency stop as well The s...
Страница 10: ...delay the auger This allows for the blade chamber to clear before intoducing more material If the meter remains high you may have a clog that needs clearing TOUCH SCREEN OPERATION The Revolution has...
Страница 11: ...dle plate To completely remove the chute depress the plastic tab on the male end of the connector and remove it from the small internal motor that is attached to the chute PAGE 9 CHANGING THE PARTICLE...
Страница 12: ...CHINE BACK TOGETHER STEP 5 Ensure the blades have been put back on and secured into place Replace the screen Replace the chute and plug back in the small internal motor that is attached to the chute i...
Страница 13: ...ing opposite of the chain guard side using an 1 8 Allen wrench Replace the removable baffle above the throat leading into the grinder Close the lid Plug the Revolution back in Revolution is clean and...
Страница 14: ...y Stop and both E stop buttons are not depressed make sure one or more of the safety limit switching has not been triggered There are four areas which have a limit safety switch which will prevent the...
Страница 15: ...our products If you have any questions or concerns please do not hesitate to talk to us about this very important disclaimer Warranties do not transfer for resold machines regardless of age of the mod...
Страница 16: ...full before the order is shipped Order quotes expire within 10 days Orders received will fall in line and be serviced accordingly where the shipment date may be sooner than originally quoted We will s...
Страница 17: ...ures or other identifying information to establish that damage was caused by the shipping carrier If you receive an item you believe is defective please contact us with details of the product at 509 2...