© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved
State: 14.02.2019 p. 2
Mounting instructions for horizontal bar „supra 1“
Item No. 55 1514 402
1. Select the play equipment location in consideration of the required safety
area (see Diagram 3: 1500 x 3000 mm).
2. Carry out excavation work for the foundation as shown in Diagram 2. After
excavation, compress the foundation floor.
Note:
The horizontal bar is built in on the play level. Pay attention to items
marked „play level“ of play equipment!
3. Set up the two concrete foundations acc. to the dimensions indicated in Dia-
gram 2 with central, horizontal reinforcement.
4. After a setting period of 10-14 days, depending on weather conditions and
foundation size, clean the surface of the foundation.
5. Place the pre-assemled play equipment on the foundation and screw it with
the heavy-duty dowels included in the delivery.
6. Fill up and compress the holes between the foundation and the foundation
hole with the excavation.
7. Seal the whole minimum zone/safety area with the impact protection required
for the fall heights indicated. Set up impact-absorbing playground surfacing
according to EN 1176-1.
Critical drop height: 1000mm
Recommended surface material: grass, sand, wood chip, gravel, synth. fall
protection
8. Do not allow children to use the equipment before the installation has been
finished.
Diagram 3: Top view
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25
Extent of the minimum
zone = safety area
Diagram 2: Side view with dimension details „supra1“
700
500
700
450
980
448
1869
1534
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
supra 1 (450)
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:20
A3
Gewicht
Name
Name
Fundamentplan
2102-00-00
15.91
Maßstab
Simonis
23.02.18
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
Concrete
Füllmaterial
Filling
Erde
Ground
Legende
700
500
700
450
980
448
1869
1534
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
supra 1 (450)
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:20
A3
Gewicht
Name
Name
Fundamentplan
2102-00-00
15.91
Maßstab
Simonis
23.02.18
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
Concrete
Füllmaterial
Filling
Erde
Ground
Legende
3000
1500
1500
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
supra 1 (150)
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:20
A3
Gewicht
Name
Name
Draufsicht
2101-00-00
Maßstab
Simonis
02.05.18
A
Fallraum kleiner
14.02.19
ES
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland