Mounting instructions for balance plate „statim“
Item No. 51 1513 401
Diagram 2: Foundation plan
1. Select the location of the play equipment taking into account the required mini-
mum space (see diagram 3).
2. Carry out excavation work for the foundations as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The balance plate is installed at play level.
Pay attention to items marked „play level“ at play equipment!
3. Set up the concrete foundations according to diagram 2 with central, horizontal
reinforcement. Pour the supplied foundation anchor in the middle foundation so
that the upper angle frame is horizontal and flush with the foundation surface.
4. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and the
foundation hole with excavation.
5. Clean the foundation surface and place the balance equipment on the foundati-
on anchor and screw it down.
6. Screw the handrail onto the foundations using the included heavy-duty dowels.
Note: Pay attention to a concentric position of the handrail and the „statim“.
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25
1446
1247
400
500
350
850
382
1629
450
B
B
400
400
400
400
400
400
1803
500
252
50
252
252
1152
B-B
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
statim
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
0305-00-00
Maßstab
Schramm
12.04.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
B Boden
09.06.20 ES
SI
19.12.18
Geländerfundament auf 450
A
Datum
Änderung
Rev
beliebiger Boden
optional floor
Play level
Foundation anchor