background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

State: 04.06.2020  p. 2

Mounting instructions for seesaw „sinio asto“ 

Item No. 51 2519 401

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be 

made on the entire impact area of every equipment that cause forced move-
ment.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The seesaw is installed at play level.  

Pay attention to items marked „play level“ at play equipment! 

4.  Set up the concrete foundation according to diagram 2 with central, horizon-

tal reinforcement. 

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25

Diagram 2: Foundation plan

2160

1600

500

450

1779

489

597

970

1350

450

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

sinio asto

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundamentplan

0413-00-00

Maßstab

Simonis

06.11.18

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

Datum

Änderung

Rev

2160

1600

500

450

1779

489

597

970

1350

450

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

sinio asto

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundamentplan

0413-00-00

Maßstab

Simonis

06.11.18

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

Datum

Änderung

Rev

Play level

Concrete foundation

Отзывы: