Mounting instructions for hexagon swing „seta Robinie“ 

Item No. 51 2025 601

State: 17.08.2020 p. 2

Concrete foundations

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundations as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The swing is installed at play level.  

Pay attention to items marked „play level“ at play equipment! 

4.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement. 

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

500

 5893 

450

400

2675

7161

1400

600

3061

1661

6502

 4361 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

seta Robinie

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:45

A3

Name

Name

Fundamentplan

0509-00-00

Maßstab

Schramm

24.07.18

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

18.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Diagram 2: Foundation plan

play level

Reinforcement plan: 

Concrete foundation with rein-

forcement
Main foundation: BSt 500S 
7 stirrups Ø 12mm crosswise 
6 stirrups Ø 12mm lengthwise 
Concrete cover h´= 3 cm 