background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Mounting instructions for slide „quina“

Item-No. 51 3532 601

State: 04.06.2020 p. 2

 

Play level

Concrete 

foundation

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 4). 

Note: 

Due to possible overheating, do not place the slide surface southernly.

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundations as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The slide is installed at play level. Pay attention to items marked „play 

level“ at play equipment!  

4.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

6.  Clean the surface of the foundations and start with the installation of the play 

equipment. 

600

1000

400

1835

915

4317

450

1455

2630

 400 

1000

800

600

1291

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

quina

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:25

A3

Name

Name

Fundamentplan

0608-00-00

Maßstab

Behnke

13.04.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

18.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Diagram 2: Foundation plan

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25 – C25/30

Отзывы: