1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The springrider is installed at play level. 

3.  Place the play equipment with foundation anchor as shown in diagram 2 in 

the foundation hole.

4.  Place the play equipment with foundation anchor into the concrete mass as 

shown in diagram 2, so that the base plate is surrounded by a concrete thick-
ness of at least 50 mm both above and below. 

5. 

Pour the foundation floor with concrete to a height of appr. 100 mm. 

6.  After a setting period of 10 - 14 days, depending on weather conditions and 

foundation size, cover the entire impact area with fall protection according to 
the required drop height in accordance with EN 1176-1. 

Critical drop height: 340 mm

 

Recommended surface material: grass, sand, wood chip, gravel,  
synth. impact protection. 

7.  Do not allow children to use the equipment before the installation has been 

finished.  

 

Concrete foundation

252

100

600

50

450

 340 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

pinna2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:10

A3

Name

Name

Fundamentplan

0109-00-00

Maßstab

Schramm

28.09.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete
gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B beliebiger Boden

24.09.20 SI

SI

15.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

beliebiger Boden

optional floor

252

100

600

50

450

 340 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

pinna2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:10

A3

Name

Name

Fundamentplan

0109-00-00

Maßstab

Schramm

28.09.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete
gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B beliebiger Boden

24.09.20 SI

SI

15.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

beliebiger Boden

optional floor

Diagram 2: Foundation plan

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25