Mounting instructions for climbing equipment  

„Multifunctional trainer glulam“ 

Item-No. 51 5512 601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 4). 

2.  Carry out excavation work for foundations as shown in diagram 2. 

After excavation compress the foundation floor.

 

Note: 

The climbing equipment is installed at play level.  

Pay attention to items marked „play level“ at play equipment!  

3.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement.

4.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation. 

5.  Clean the foundation surface. Connect the three composite lumbers at the 

provided ends with the head part using the screws, cap nuts and threaded 
bars included in the delivery. Do a rough aligning at the foundation. 

Note: Do not screw the base plates to the foundations yet!

6.  Connect the climbing elements at the intended locations acc. to diagram 1 

and 4 with the screws, cap nuts and threaded bars included in the delivery.

Diagram 2: Foundation plan

Reinforcement plan: 

Concrete foundation with reinforcement

Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C25/30

400

150

550

 2558 

A

A

4228

1083

1903

1083

1903

1941

1941

1721

1721

1856

1876

3044

4210

4364

4964

600

600

600

1000

600

600

1000

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

Leimbinder Fitness

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundamentplan

2017-00-00

Maßstab

Mattheis

25.11.16

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

28.07.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

400

150

550

 2558 

A

A

4228

1083

1903

1083

1903

1941

1941

1721

1721

1856

1876

3044

4210

4364

4964

600

600

600

1000

600

600

1000

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

Leimbinder Fitness

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundamentplan

2017-00-00

Maßstab

Mattheis

25.11.16

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

28.07.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

400

150

550

 2558 

A

A

4228

1083

1903

1083

1903

1941

1941

1721

1721

1856

1876

3044

4210

4364

4964

600

600

600

1000

600

600

1000

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

Leimbinder Fitness

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundamentplan

2017-00-00

Maßstab

Mattheis

25.11.16

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

28.07.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

play level

Отзывы: