State: 04.01.2021 p. 2
Mounting instructions for climbing equipment
„Multifunctional trainer glulam“
Item-No. 51 5512 601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 4).
2. Carry out excavation work for foundations as shown in diagram 2.
After excavation compress the foundation floor.
Note:
The climbing equipment is installed at play level.
Pay attention to items marked „play level“ at play equipment!
3. Set up the concrete foundations according to diagram 2 with central, horizon-
tal reinforcement.
4. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
5. Clean the foundation surface. Connect the three composite lumbers at the
provided ends with the head part using the screws, cap nuts and threaded
bars included in the delivery. Do a rough aligning at the foundation.
Note: Do not screw the base plates to the foundations yet!
6. Connect the climbing elements at the intended locations acc. to diagram 1
and 4 with the screws, cap nuts and threaded bars included in the delivery.
Diagram 2: Foundation plan
Reinforcement plan:
Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C25/30
400
150
550
2558
A
A
4228
1083
1903
1083
1903
1941
1941
1721
1721
1856
1876
3044
4210
4364
4964
600
600
600
1000
600
600
1000
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Leimbinder Fitness
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:35
A3
Name
Name
Fundamentplan
2017-00-00
Maßstab
Mattheis
25.11.16
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
28.07.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
400
150
550
2558
A
A
4228
1083
1903
1083
1903
1941
1941
1721
1721
1856
1876
3044
4210
4364
4964
600
600
600
1000
600
600
1000
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Leimbinder Fitness
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:35
A3
Name
Name
Fundamentplan
2017-00-00
Maßstab
Mattheis
25.11.16
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
28.07.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
400
150
550
2558
A
A
4228
1083
1903
1083
1903
1941
1941
1721
1721
1856
1876
3044
4210
4364
4964
600
600
600
1000
600
600
1000
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Leimbinder Fitness
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:35
A3
Name
Name
Fundamentplan
2017-00-00
Maßstab
Mattheis
25.11.16
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
28.07.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
play level