background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.     

Mounting instructions for springrider „mina swing“ 

Item No. 51 3011 601

State: 29.05.2020 p. 2

 

Play level

Foundation anchor

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3: 3700 x 3400 mm). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The springrider is installed at play level. 

4.  Place the play equipment with foundation anchor as shown in diagram 2 in 

the foundation hole.

5.  Place the play equipment with foundation anchor into the concrete mass as 

shown in diagram 2, so that the base plate is surrounded by a concrete thick-
ness of at least 50 mm both above and below.

6. 

Pour the foundation floor with concrete to a height of appr. 100 mm. 

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25

 897 

100

600

50

450

565

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

mina

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:8

A3

Name

Name

Fundamentplan

0115-00-00

Maßstab

Behnke

21.11.2016

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 
SI

06.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Diagram 2: Foundation plan

Concrete foundation

Отзывы: