background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: Stand: 30.03.2021  S. p. 2

 

Mounting instruction wendy house „maris“ 

Item-No.. 51 8021 602

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3). 

2.  Carry out excavation work for the foundations as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note:

The play equipment is built on the play level. Pay attention to items 

marked „play level” at play equipment!

3.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement.

4.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation. 

5.  Clean the surface of the foundations and start with the installation of the play 

equipment. Align the posts on the foundation. Pay attention to the position of 
the post with the hub wheel. It has to be placed to the cross foundation. Safe 
the posts during the whole construction against overturning! 

6.  Attach the sail to the shackles at the post. On the clamping side, let the 

threaded rod with the ring nut protrude a little to enable re-clamping, see 
diagram 4a. 

Note:

 Slide the posts apart so that the sail does not sag. 

7.  Hang up the rope. Align the foundation plate of the rope so that it does not 

sag.

Diagram 2: Foundation plan

450

 3178 

2060

 450 

A

A

500

395

745

350

1450

400

800

300

350

700

300

2448

800

3330

 1140 

 1140 

554

690

218

1224

618

340  268 

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

maris (450)

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:25

A3

Name

Name

Fundamentplan

1219-00-00

Maßstab

Schramm

26.03.21

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

Datum

Änderung

Rev

play level

Reinforcement plan: 

Concrete foundation with reinforcement

Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25

clamping side