background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Mounting instructions for slackline „lixus“ modular unit 1 

Item-No.  51 6510 402

state: 03.01.2018 p. 2

 

1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 3: 8600 x 3600mm). 

2.  Carry out excavation work the foundation as shown in Diagram 2. After exca-

vation, compress the foundation floor.

 

Note: 

The slackline is built in on the play level. Pay attention to items marked 

„game level“ of play equipment! 

3.  Set up the concrete foundations acc. to the dimensions indicated (LxWxH 

800 x 800 x 600mm) with central, horizontal reinforcement (BST 500 S) in the 
quality class C 20/25. It shed the supplied anchor bolts with the foundation 

that the upper angle frame is horizontal and flush with the foundation surface.

4.  After a setting period of 10-14 days, depending on weather conditions and 

foundation size, clean the surface of the foundation.

5.  Put the poles of the play equipment on the foundation with the correct dis-

tance and screw it with the anchor bolts included in the delivery. 

Note:

 Do not screw the ropes yet, but take care of the exact distances of the 

posts (5000 mm, measured from the middle of the post). 

rope

platform

Diagram 2: Side view with dimension details „lixus“

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Ever 4 stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class B25

IMPORTANT: The distance dimensions must be kept  exactly!

5000

800

600

450

800

1696

5596

345

Erde 

Ground

Füllmaterial

Filling

Beton

Concrete

Blatt:

Projekt:

Artikelnummer:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ

:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

1

0307-00-00

551515401

5606x606x2440

Fertigung:

Mattheis

 

Gewicht:

147063.3

Slackline 1A

Zust.

Änderung

Name

Abmaße:

Zuschnitt:

Fundament

Datum

18.01.17

5000

800

600

450

800

1696

5596

345

Erde 

Ground

Füllmaterial

Filling

Beton

Concrete

Blatt:

Projekt:

Artikelnummer:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ

:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

1

0307-00-00

551515401

5606x606x2440

Fertigung:

Mattheis

 

Gewicht:

147063.3

Slackline 1A

Zust.

Änderung

Name

Abmaße:

Zuschnitt:

Fundament

Datum

18.01.17

Содержание lixus

Страница 1: ...ck 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for slackline lixus modular unit 1 Item No 51 6510 402 state 03 01 2018 p 1 Diagram 1 Overall view of the play equipment ...

Страница 2: ...ver 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class B25 IMPORTANT The distance dimensions must be kept exactly 5000 800 600 450 800 1696 5596 345 Blatt Projekt Artikelnummer ZG NR BENENNUNG OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONST...

Страница 3: ...nnung Gepr Werkstoff Blatt Datum Projekt Gez Zuschnitt Zeichnungsnummer Rev Änderung Datum 1 20 A3 Gewicht Name Name Details 0307 00 00 148137 4 Maßstab Schramm 24 11 17 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland B 80mm Vorspannung Diagram 3b connection part clamping device Exactly 80 mm pretension corresponds 120 kg under load 80 mm pretension 6 Fill up and compress the holes between...

Страница 4: ...erial optional The impact area must be free of any sharp edged or dangerously protruding parts and must be installed in such a way that it does not create a trap 10 Do not allow children to use the equipment before the installation has been finished 11 During the first days of usage it is possible that the rope elongates A few days after the first use check the ropes and if necessary re stress the...

Страница 5: ...re cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavily soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoh...

Отзывы: