© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
Mounting instructions for springrider „frondis1“
Item No. 51 3012 401
State: 29.05.2020 p. 2
Play level
Foundation anchor
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 3).
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundation as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The springrider is installed at play level.
4. Place the play equipment with foundation anchor as shown in diagram 2 in
the foundation hole.
5. Place the play equipment with foundation anchor into the concrete mass as
shown in diagram 2, so that the base plate is surrounded by a concrete thick-
ness of at least 50 mm both above and below.
6.
Pour the foundation floor with concrete to a height of appr. 100 mm.
550
100
600
480
593
450
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Frondis1
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:10
A3
Name
Name
Fundamentplan
0111-00-00
Maßstab
Mattheis
04.01.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
11.05.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
550
100
600
480
593
450
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Frondis1
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:10
A3
Name
Name
Fundamentplan
0111-00-00
Maßstab
Mattheis
04.01.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
11.05.20
stoßdämpfender Boden
A
Datum
Änderung
Rev
Diagram 2: Foundation plan
Foundation
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25