© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved
State: 27.04.2018 p. 2
Mounting instructions for speaking tube „fera“
Item No. 51 5210 401
1.
Select the play equipment location in consideration of final positions.
Note:
Please make sure that there will be a minimum distance of 1.50 m to
the impact protection areas of other play equipment
2. Carry out excavation work for the foundation anchor as shown in Diagram 2.
After excavation, compress the foundation floor.
Note:
The speeking tube is built in on the play level. Pay attention to items
marked „game level“ of play equipment!
3. Set up the two concrete foundation acc. to the dimensions indicated (LxWxH
600 x 600 x 500 mm) with central, horizontal reinforcement (BST 500 S) in
the quality class C 20/25.
4. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, clean the surface of the foundation, place the pre-mounted
play equipment onto it and screw the base plate of the play equipment onto
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Diagram 2: Side view with dimension details „fera“
500
600
600
9614
10000
450
392
1391
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
fera
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:20
A3
Gewicht
Name
Name
Fundamentplan
1602-00-00
2863.6
Maßstab
Behnke
10.08.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
Concrete
Füllmaterial
Filling
Erde
Ground
Legende