Mounting instruction large play equipment „angulus 2A“

Item-No. 51 7522 601

1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 3: 6300x5250mm). 

2.  Carry out excavation work for 5 foundations as shown in Diagram 2.  

After excavation, compress the foundation floor.

 

Note: 

The combination equipment is built in on the play level. Pay attention 

to items marked „game level” of play equipment!

3.  Setup the two main foundations (LxWxH 995x600x400mm), and the founda-

tion for the climbing arc (LxWxH 600 x 600 x 400mm), the foundation for the 
sliding bar (LxWxH 800x400x400mm) and the foundation of the climbing net 
(LxWxH 1300x400x400) acc. to the dimensions indicated in diagram 2 the 
quality class C 20/25 with horizontal reinforcement. 

4.   After a setting period of 10-14 days, depending on weather conditions and 

foundation size - clean the surface of the foundations and start with the instal-
lation of the combination equipment. 

450

400

850

A

A

966

2132

716

3198

995

600

600

600

400

1300

800

400

600

995

1821

1647

1021

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

angulus2

x

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:30

A3

Gewicht

Name

Name

Fundament

1021-00-00

7914.2

Maßstab

Mattheis

22.03.17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

Concrete

Füllmaterial

Filling

Erde

Ground

Legende

450

400

850

A

A

966

2132

716

3198

995

600

600

600

400

1300

800

400

600

995

1821

1647

1021

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

angulus2

x

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:30

A3

Gewicht

Name

Name

Fundament

1021-00-00

7914.2

Maßstab

Mattheis

22.03.17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

Concrete

Füllmaterial

Filling

Erde

Ground

Legende

Diagram 2: Foundation plan with dimension details „angulus 2“

Reinforcement plan:

Concrete foundation with reinforcement
Main foundation: BSt 500S 
Ever 4 stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Foundations for attachment parts are no-reinforced

Содержание angulus 2A

Страница 1: ...hts and product modifications reserved State 05 04 2017 p 1 Mounting instruction large play equipment angulus 2A Item No 51 7522 601 climbing arc sliding bar hexagons Post climbing net Diagram 1 Overall view of play equipment with description of individual elements ...

Страница 2: ...with the instal lation of the combination equipment 450 400 850 A A 966 2132 716 3198 995 600 600 600 400 1300 800 400 600 995 1821 1647 1021 A A OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERREC...

Страница 3: ...nted construction of the hexagons at the posts as described in diagramm 1 and 2 on the foundation Note Do not screw the base plates onto the foundations yet 6 Connect the climbing arc the sliding bar and the climbing net with the hexagons as described in diagram 4 and fix it screws inclu ded in delivery 7 Align the play equipment more on the foundations Note Avoid sagging of the climbing net 8 Dri...

Страница 4: ...rub off and leave small steel particles in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the fact that the components are made of stainless steel with no normal steel parts in contact OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHN...

Страница 5: ...aner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavily soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleaning agents and solvents e g ethyl alcohol isopropyl alcohol or ace tone Howeve...