background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.      

Mounting instructions for springrider „altus2 flower“

 

Item No. 51 3021 403

State: 02.06.2020 p. 2

 

1.  Select the location of the play equipment taking into account the required 

minimum space  (see diagram 3). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The springrider is installed at play level. 

4.  Place the play equipment with foundation anchor as shown in diagram 2 in 

the foundation hole.

5.  Place the play equipment with foundation anchor into the concrete mass as 

shown in diagram 2, so that the base plate is surrounded by a concrete thick-
ness of at least 75 mm both above and below. 

6. 

Pour the foundation floor with concrete to a height of appr. 150 mm. 

Foundation anchor 

Play level

Concrete foundation

Diagram 2: Foundation plan

600

1479

575

425

1042

569

 150 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

altus 2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:10

A3

Name

Name

Fundament

0119-00-00

Maßstab

Schramm

01.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

19.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

600

1479

575

425

1042

569

 150 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

altus 2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:10

A3

Name

Name

Fundament

0119-00-00

Maßstab

Schramm

01.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
SI

19.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25

Содержание Altus2 flower

Страница 1: ...heck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for springrider altus2 flower Item No 51 3021 403 State 02 06 2020 p 1 Diagram 1 Overall view of the play equipment ...

Страница 2: ...50 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT 1 altus 2 Benennung Gepr Blatt Datum Projekt Gez Zeichnungsnummer 1 10 A3 Name Name Fundament 0119 00 00 Maßstab Schramm 01 03 ...

Страница 3: ...ll not be used in such cases NOTE Play equipment which contain components made of stainless steel should not come with normal steel parts in contact Those steel parts may rub off and leave small steel particles in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine with an abrasive 240 grit to remove Please take care when transporting and sett...

Страница 4: ...l liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavily soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleaning agents and solvents e g ethyl alcohol isopropyl alcohol or ace...

Отзывы: