Mounting instructions for seesaw „acula“ 

Item No. 51 2517 601

1.  Select the location of the play equipment taking into account the required mini-

mum space (see diagram 3). 

2.  The impact area of a playground equipment with an enforced movement is not 

allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The seesaw is installed at play level.  

Pay attention to items marked „play level“ at play equipment!  

4.  Set up the concrete foundations according to diagram 2 with central, horizontal 

reinforcement. The tube of the seesaw softeners have to be set in concrete.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and the 

foundation hole with excavation.

6.  Clean the foundation surface and place the play equipment on it. Screw the 

play equipment onto the foundation using the included heavy-duty dowels. 

7.  Cover the entire impact area with fall protection according to the required drop 

height in accordance with EN 1176-1.  

Critical drop height: 900 mm

 

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25

Diagram 2: Foundation plan

300

850

3187

450

868

601

350

350

295

75

 300 

 270 

300

850

300

1500

300

300

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

acula

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundament

0409-00-00

Maßstab

Schramm

23.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

C stoßdämpfender Boden

13.05.20 ES

B Dämpfer neu + weiter

22.06.18 SI

DB

13.06.17

Wippendämpfer enger

A

Datum

Änderung

Rev

300

850

3187

450

868

601

350

350

295

75

 300 

 270 

300

850

300

1500

300

300

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

acula

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundament

0409-00-00

Maßstab

Schramm

23.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

C stoßdämpfender Boden

13.05.20 ES

B Dämpfer neu + weiter

22.06.18 SI

DB

13.06.17

Wippendämpfer enger

A

Datum

Änderung

Rev

Play level

Foundation

Содержание acula

Страница 1: ...iet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved State 03 06 2020 p 1 Mounting instructions for seesaw acula Item No 51 2517 601 Diagram 1 Overall view of play equipment ...

Страница 2: ... with reinforcement Main foundation BSt 500S Stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 20 25 Diagram 2 Foundation plan 300 850 3187 450 868 601 350 350 295 75 300 270 300 850 300 1500 300 300 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH ...

Страница 3: ...ase make sure that protruding parts e g screws gusset plates are covered with appropriate fall protection 8 Please install at the point of impact suitable impact absorbing elements A suitable impact absorbing element must achieve the following require ments the movement must be stopped gradually so that there is no sudden stop or a sudden inversion of the movement 9 Do not allow children to use th...

Страница 4: ...g soiling it is appropriate to clean the playground equipment at intervals of three to six months WOOD NOTE For all play equipment with wooden elements it cannot be ruled out that dry cracks may develop These natural changes of wood are dependent on climate con ditions as well as on the age and usage of the play equipment Longer dry periods may lead to more dry cracks This development however does...

Отзывы: