© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
State: 03.06.2020 p. 2
Mounting instructions for seesaw „acula“
Item No. 51 2517 601
1. Select the location of the play equipment taking into account the required mini-
mum space (see diagram 3).
2. The impact area of a playground equipment with an enforced movement is not
allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundation as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The seesaw is installed at play level.
Pay attention to items marked „play level“ at play equipment!
4. Set up the concrete foundations according to diagram 2 with central, horizontal
reinforcement. The tube of the seesaw softeners have to be set in concrete.
5. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and the
foundation hole with excavation.
6. Clean the foundation surface and place the play equipment on it. Screw the
play equipment onto the foundation using the included heavy-duty dowels.
7. Cover the entire impact area with fall protection according to the required drop
height in accordance with EN 1176-1.
Critical drop height: 900 mm
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Diagram 2: Foundation plan
300
850
3187
450
868
601
350
350
295
75
300
270
300
850
300
1500
300
300
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
acula
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundament
0409-00-00
Maßstab
Schramm
23.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
C stoßdämpfender Boden
13.05.20 ES
B Dämpfer neu + weiter
22.06.18 SI
DB
13.06.17
Wippendämpfer enger
A
Datum
Änderung
Rev
300
850
3187
450
868
601
350
350
295
75
300
270
300
850
300
1500
300
300
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
acula
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundament
0409-00-00
Maßstab
Schramm
23.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
C stoßdämpfender Boden
13.05.20 ES
B Dämpfer neu + weiter
22.06.18 SI
DB
13.06.17
Wippendämpfer enger
A
Datum
Änderung
Rev
Play level
Foundation