30 |
P a g e
STEP 5.2
PAD BOLT INSALLATION -
The T handle must be installed on the opposite door to the pad bolted door (fixed door)
5.2 - ASSEMBLY PARTS
–
PAD BOLT INSTALLATION
PART CODE
QTY
DESCRIPTION
PB
2
Pad bolt
HS
8
Hinge Screw
5.2 - ASSEMBLY
–
PAD BOLT INSTALLATION
Hold PB in position and fasten to door. Mark centre of bolt and drill 12mm hole in marked
position. Repeat for bottom pad bolt.
STEP 5.3
DOOR HANDLE ASSEMBLY
5.3 - ASSEMBLY PARTS
–
DOOR HANDLE ASSEMBLY
PART CODE QTY
DESCRIPTION
TH
1
T Handle
5.3 - ASSEMBLY
–
DOOR HANDLE ASSEMBLY
Mark and drill 12mm centre hole in position shown, 50mm in from door edge. T Handle
must be installed centre of the centre door brace (on the back)
Insert T handle in position and mark two outside holes. Remove T handle and drill 2 x 6mm
holes.
Insert T handle back in with bolts, and fasten nuts on back of door.
Содержание Willow S3061
Страница 41: ...40 P a g e ...
Страница 44: ...43 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Страница 45: ...44 P a g e ...
Страница 46: ...45 P a g e ...
Страница 47: ...46 P a g e ...
Страница 48: ...47 P a g e ...
Страница 49: ...48 P a g e ...
Страница 50: ...49 P a g e ...