7 |
P a g e
STEP 2.0
WALL ASSEMBLY
IF ADDITIONAL WINDOW OPTION PURCHASED (WP
–
900MM WINDOW PANEL), IT CAN BE
POSITIONED ANYWHERE ON THE SHED WHERE WE HAVE USED A P (9000MM WALL PANEL)
2.0 - ASSEMBLY PARTS
–
WALL ASSEMBLY
PART CODE QTY
DESCRIPTION
FWP
1
930mm Front Window Wall panel
P
1
900mm Wall panel
65HHS
3
65mm Hex head screw
2.0
- ASSEMBLY
–
WALL ASSEMBLY
Screw through P into FWP (top, centre & bottom) using 3 x 65HHS. (Holding studs flush on
the
outside
)
Note: Ensure tongue on VJ Cedar Cladding is facing upwards
P
Screw 3 x 65HHS (Top,
centre & bottom)
FWP
Cedar Strip
When screwing the four corners
together please make sure the
studs are flush on the outside
(not the inside) as per image
below.
Содержание Hazel 9x6
Страница 43: ...42 P a g e ...
Страница 46: ...45 P a g e IMAGES TO HELP WITH INSTALLATION FLOOR ...
Страница 47: ...46 P a g e ...
Страница 48: ...47 P a g e ...
Страница 49: ...48 P a g e ...
Страница 50: ...49 P a g e ...
Страница 51: ...50 P a g e ...
Страница 52: ...51 P a g e ...
Страница 53: ...52 P a g e ...
Страница 54: ...53 P a g e ...