Checks and actions prior to commissioning
Commissioning
NOTE
Check that no commands are activated before
switching on the truck.
–
Check that the battery is connected and
locked and that the hood is closed correctly.
–
Enter the truck.
–
Adjust the backrest.
–
Pull the emergency off switch (1).
–
Turn the key (2). For models equipped with
an electronic key, enter the 5-digit PIN code
to start the truck.
–
Press the operator presence pedal.
The display (3) lights up. The truck is now
ready for use.
Emergency off switch
To check the operation of the emergency off
switch, proceed as follows:
–
Press the emergency off switch (1).
The truck power supply is cut. The electrical
controls and motors are no longer supplied
with power.
–
Pull the emergency off switch (1).
–
Start the truck (key or electronic key).
The functions are available again.
Use
4
Checks and actions prior to commissioning
34
11548011551 EN - 02/2021 - 07
Содержание SXH-20
Страница 1: ...Electric pallet truck SXH 20 Original instructions 1609 2367 11548011551 EN 02 2021 07 ...
Страница 2: ......
Страница 4: ......
Страница 9: ...6 Technical specifications SXH 20 datasheet 106 Table of contents VII 11548011551 EN 02 2021 07 ...
Страница 10: ......
Страница 11: ...1 Introduction ...
Страница 20: ...Introduction 1 Disposing of components and batteries 10 11548011551 EN 02 2021 07 ...
Страница 21: ...2 Safety ...
Страница 31: ...3 Overviews ...
Страница 40: ...Overviews 3 Markings 30 11548011551 EN 02 2021 07 ...
Страница 41: ...4 Use ...
Страница 93: ...5 Maintenance ...
Страница 115: ...6 Technical specifications ...
Страница 116: ...SXH 20 datasheet Technical specifications 6 SXH 20 datasheet 106 11548011551 EN 02 2021 07 ...
Страница 120: ...Technical specifications 6 SXH 20 datasheet 110 11548011551 EN 02 2021 07 ...
Страница 124: ......
Страница 125: ......
Страница 126: ...STILL GmbH 11548011551 EN 02 2021 07 ...