4
Operation
General commissioning
General commissioning
Commissioning
If the vehicle is delivered only partially assem-
bled, ensure before commissioning that the
whole truck has been professionally assem-
bled. All hydraulic and electrical connections
have to be checked. The connections, which
must be disassembled for shipping should be
reassembled carefully. All nuts and bolts must
be tightened to the appropriate torque. After
the oil levels on the hydraulic tank and gear
box have been checked, commissioning can
begin. This commissioning should be done
professionally be our service personnel. Be-
fore starting work, work through the Checklist
before starting work.
40
5213 804 2501 EN - 01/2016
Содержание EK-X
Страница 1: ...Original instructions High level order picker EK X 2131 2133 5213 804 2501 EN 01 2016 ...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 Foreword ...
Страница 15: ...2 Safety ...
Страница 30: ...2 Safety Personal protective equipment 24 5213 804 2501 EN 01 2016 ...
Страница 31: ...3 Overview ...
Страница 44: ...3 Overview Safety equipment 38 5213 804 2501 EN 01 2016 ...
Страница 45: ...4 Operation ...
Страница 86: ...4 Operation Emergency operation 80 5213 804 2501 EN 01 2016 ...
Страница 87: ...5 Maintenance ...
Страница 99: ...6 Technical data ...
Страница 101: ...7 Special equipment ...
Страница 119: ......
Страница 120: ...STILL GmbH 5213 804 2501 EN 01 2016 ...