background image

General information:

The tube sets should be transported horizontally.  Only up to max. 7 cartons may be stacked on 
top of one and other. Our installation sets are valid for all snow load zones (except zone 3).
In storm areas, special structural analyses must be carried out.

Work safety information:

Wear a helmet, hearing protection and protective glasses! Attach fall protection equipment! 
Handle glass tubes only while wearing gloves (are included).

13

13 27

30

Installation instructions for:

Required tools:

Possible installation types:

Facade, Pitch roof, Folded seam roof, corrugated metal roof

Caution!

The collectors are to be installed so that the distributor tube is in the top position. 
Please make sure that the tubes are oriented towards the sun.
The min. and max. installation angle should be from 20° to 90°.

i

Tile roof 

Facade

Connection

1

2

20 °

90 °

+

09

Installation instructions

     

  •  

SP-20

  •  

SP-30

 

 

Stiebel Eltron, Inc. 

 

17 West Street

 

West Hatfield, MA

 

01088

Telephone: 800.582.8423 | Fax: 413.247.3369 | [email protected] | www.stiebel-eltron-usa.com

Simply the Best

Simply the Best

S-Power
SP-20

S-Power
SP-20

Simply the Best

S-Power
SP-30

S-Power
SP-30

Содержание S-Power SP-20

Страница 1: ...the S Power vacuum tubes From glass factory to finished high performance vacuum tubes HighTech Made in Germany Solar Keymark Installation instructions Heat Pipe PERFORMANCE SERIES S Power Heat Pipe C...

Страница 2: ...Simply the Best Prior to installation please check for updates to this document at www stiebel eltron usa com install html S Power Performance Series Instruction Manual Rev April 2012...

Страница 3: ...s situation which if not avoided could result in minor or moderate injury NOTICE NOTICE is used to address practices not related to personal injury This symbol is used when there is a risk of of burni...

Страница 4: ...Do not talk on your cell phone eat drink or chat unnecessarily while you are on the rooftop or ladder If it is windy or rainy delay the project Working at height with wet ladder steps and on slick sur...

Страница 5: ...re properly engaged Do not exceed the maximum load rating of a ladder Be aware of the ladder s load rating and of the weight it is supporting including the weight of any tools or equipment A ladder pl...

Страница 6: ...tem has to be connected to the building s ground over short runs for both the feed and the return lines Handling Glass Tubes WARNING The glass tubes have a vacuum Damage due to external pressure loadi...

Страница 7: ...e is danger of falling Please con sider the accident prevention regulations e g OSHA and use appropriate safeguards Personal Risk of Falling Objects WARNING During installations on the roof there is a...

Страница 8: ...fication WHO IS ALLOWED TO INSTALL SOLAR COLLECTORS The following aspects should be considered when planning a system What energy will be consumed in what period of time Will demand consumption be con...

Страница 9: ...tructions for Required tools Possible installation types Facade Pitch roof Folded seam roof corrugated metal roof Caution The collectors are to be installed so that the distributor tube is in the top...

Страница 10: ...3 Install on wall or fa ade Install on corrugated metal Mark drill insert wall plug install cap profile with key screw NW 13 nm mount with suitable screws for corrugated metal and flat roof installati...

Страница 11: ...ches 37 75 inches 38 75 inches 55 5 inches 11 Installation instructions SP 20 SP 30 Stiebel Eltron Inc 17 West Street West Hatfield MA 01088 Telephone 800 582 8423 Fax 413 247 3369 info stiebel eltron...

Страница 12: ...6 Place the safety rubber ring on top of the glass metal connection Rotate constantly the s power high performance heat pipe tube while inserting into the hole in the collector casing Insert the tube...

Страница 13: ...porting bracket Collector casing 15 15 Recommendation The casing may be mounted to the supporting bracket even before inserting the tubes as the tube is lockable by itself 13 Installation instructions...

Страница 14: ...verted connections the adapter Art No 791069 should be used 18 19 20 21 22 23 On the left hand side lubricate the o ring of the collector connection with silicone grease connect the corrugated hose pu...

Страница 15: ...ANTIES THE WARRANTY PRINTED ABOVE IS THE ONLY WARRANTY APPLICABLE TO THIS PURCHASE ALL OTHER WARRANTIES EXPRESS OR IM PLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND F...

Страница 16: ...sa com Internet www stiebel eltron usa com We are available for questions concerning the installation of our high quality vacuum tube collectors at any time Stiebel Eltron Inc 17 West Street West Hatf...

Отзывы: