
www.stiebel-eltron.com
FCR 21 |
21
EN
GL
ISH
INSTALLATION
Specification
Connection example for dual circuit, dual meter reading
1/N/PE ~ 230 V or 3/N/PE ~ 400 V
5
PE
K1
K2
K2
K1
L1
N
L3
L2
HT
kWh
NT
kWh
D
00000
65
56
4
3
2
———1
4
K1 Contactor 1
K2 Contactor 2
1 Connections also required for 3/N/PE ~ 400 V
2 Power-OFF contact
3 Off-peak tariff meter
4 Peak tariff meter
f
f
Ensure connection to the same phase.
Connection examples for a single circuit:
In the following connection examples, the output of the rapid
heat-up function is given in brackets.
Note the position of the circuit breaker in the control panel.
Switch position I: 2 (4) kW, 1/N/PE ~ 230 V
Switch position II: 4 (4) kW, 1/N/PE ~ 230 V
D
00000
65
55
9
Switch position I: 2 (6) kW, 3/N/PE ~ 400 V
D
00000
65
56
1
Switch position I: 3 (6) kW, 3/N/PE ~ 400 V
D
00000
65
56
2
Switch position I: 4 (6) kW, 3/N/PE ~ 400 V
Switch position II: 6 (6) kW, 3/N/PE ~ 400 V
D
00000
65
56
3
Содержание FCR 21/120
Страница 74: ...74 FCR 21 www stiebel eltron com POZNÁMKY ...
Страница 75: ...SLOVENSKY www stiebel eltron com FCR 21 75 POZNÁMKY ...